Recent improvements and present status of the Munich accelerator facility

被引:0
|
作者
Muenzer, H. [1 ]
Rohrer, L. [1 ]
Carli, W. [1 ]
Hartung, P. [1 ]
Schnitter, H. [1 ]
Trinks, U. [1 ]
机构
[1] Technischen Universitaet Muenchen, Garching, Germany
关键词
D O I
暂无
中图分类号
学科分类号
摘要
6
引用
收藏
页码:78 / 81
相关论文
共 50 条
  • [1] Recent improvements and present status of the Munich accelerator facility
    Munzer, H
    Rohrer, L
    Carli, W
    Hartung, P
    Schnitter, H
    Trinks, U
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1996, 382 (1-2): : 78 - 81
  • [2] Present status of the RIKEN Accelerator Research Facility (RARF)
    Kase, M
    Goto, A
    Kageyama, T
    Yokoyama, I
    Nagase, M
    Kohara, S
    Nakagawa, T
    Inabe, N
    Ikegami, K
    Kamigaito, O
    Kidera, M
    Fujita, J
    Yoneda, A
    Kobayashi, M
    Yano, Y
    CYCLOTRONS AND THEIR APPLICATIONS 1998, 1999, : 629 - 631
  • [3] The Argonne Wakefield Accelerator Facility: Status and recent activities
    Conde, ME
    Antipov, S
    Gai, W
    Jing, C
    Konecny, R
    Liu, W
    Power, JG
    Wang, H
    Yusof, Z
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 2688 - 2690
  • [4] Status report of the Munich tandem accelerator
    Rohrer, L
    HEAVY ION ACCELERATOR TECHNOLOGY, 1999, 473 : 88 - 91
  • [5] Recent developments for AMS at the Munich tandem accelerator
    Koll, Dominik
    Busser, Christoph
    Faestermann, Thomas
    Goemez-Guzman, J. M.
    Hain, Karin
    Kinast, Angelina
    Korschinek, Gunther
    Krieg, David
    Lebert, Manuel
    Ludwig, Peter
    Quinto, Francesca
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 2019, 438 : 180 - 183
  • [6] The status of the Munich Fission Fragment Accelerator Project
    Gross, M
    Habs, D
    Kester, O
    Ott, J
    Rao, R
    Thirolf, P
    van Egidy, T
    Kienle, P
    Köster, U
    Steichele, E
    NUCLEAR FISSION AND FISSION-PRODUCT SPECTROSCOPY: SECOND INTERNATIONAL WORKSHOP, 1998, 447 : 126 - 134
  • [7] PREPHASE ACCELERATOR - PRESENT STATUS
    DUCKERT, F
    THROMBOSIS ET DIATHESIS HAEMORRHAGICA, 1961, 6 (2-3): : 254 - &
  • [8] RECENT IMPROVEMENTS OF THE TANDEM FACILITY AT LNS
    CIAVOLA, G
    CALABRETTA, L
    CUTTONE, G
    GAMMINO, S
    RAIA, G
    RIFUGGIATO, D
    ROVELLI, A
    SCUDERI, V
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1993, 328 (1-2): : 64 - 67
  • [9] RECENT IMPROVEMENTS IN LABORATORY XAFS FACILITY
    NISHIHAGI, K
    KAWABATA, A
    TANIGUCHI, K
    JAPANESE JOURNAL OF APPLIED PHYSICS PART 1-REGULAR PAPERS SHORT NOTES & REVIEW PAPERS, 1993, 32 : 258 - 260
  • [10] Recent status and measurement examples of the compact accelerator-driven neutron facility AISTANS
    Kino, Koichi
    Fujiwara, Takeshi
    O'Rourke, Brian E.
    Oshima, Nagayasu
    10TH INTERNATIONAL MEETING OF UNION FOR COMPACT ACCELERATOR-DRIVEN NEUTRON SOURCES, UCANS-10, 2024, 298