共 50 条
- [1] AN INTEGRATED APPROACH TO GAS-WELL DELIVERABILITY ANALYSIS, HUGOTON FIELD [J]. SPE PRODUCTION & FACILITIES, 1995, 10 (04): : 265 - 269
- [2] DETERMINATION OF GAS WELL STABILIZATION FACTORS IN HUGOTON FIELD [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1969, 21 (SEP): : 1101 - &
- [3] REPLACEMENT WELL DRILLING RESULTS - HUGOTON GAS FIELD. [J]. Proceedings, Annual Meeting - Minnesota Section, AIME, 1600,
- [6] HELIUM IN HUGOTON GAS FIELD [J]. AMERICAN ASSOCIATION OF PETROLEUM GEOLOGISTS BULLETIN, 1971, 55 (09): : 1687 - &
- [7] PARAMETRIC PULSING - A NEW APPROACH TO INCREASED GAS FIELD DELIVERABILITY [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1970, 22 : 1261 - &
- [8] PARAMETRIC PULSING - A NEW APPROACH TO INCREASED GAS FIELD DELIVERABILITY [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1970, 22 (SEP): : 1056 - &
- [9] Parametric pulsing, a new approach to increased gas field deliverability [J]. JPT, Journal of Petroleum Technology, 1972, 24 : 73 - 84
- [10] PARAMETRIC PULSING - NEW APPROACH TO INCREASED GAS FIELD DELIVERABILITY [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1972, 24 (JAN): : 73 - &