共 50 条
- [4] Controlling finishing mill entry temperatures at Dofasco's no. 2 hot mill Iron and Steelmaker (I and SM), 1995, 22 (03): : 53 - 57
- [6] Electrical modernization of Dofasco's tinplate process line AISE Steel Technology, 2002, 79 (11-12): : 43 - 50
- [7] #4 continuous pickle line automated surface inspection system 37TH MECHANICAL WORKING AND STEEL PROCESSING CONFERENCE PROCEEDINGS, 1996, 33 : 187 - 193
- [8] Automation of Dofasco's No. 3 electrolytic tinning line Iron and Steel Engineer, 1999, 76 (10): : 35 - 39
- [10] CONTINUOUS TANDEM COLD MILL EQUIPMENT. Technical Review - Mitsubishi Heavy Industries, 1984, 21 (01): : 75 - 76