Chemical steam generator cleaning at Unterweser Nuclear Power Plant

被引:0
|
作者
Kostroun, F.
Kuhnke, K.
Hollwedel, Ursula
机构
来源
VGB Kraftwerkstechnik | 1995年 / 75卷 / 09期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Application of a portable quadrupole mass spectrometer in Paks Nuclear Power Plant for control of steam generator chemical cleaning
    Molnár, M
    Palcsu, L
    Pintér, T
    Patek, G
    Szántó, Z
    Svingor, É
    Futó, I
    JOURNAL OF MASS SPECTROMETRY, 2002, 37 (02): : 230 - 231
  • [2] STEAM GENERATOR CHEMICAL CLEANING AT OCONEE NUCLEAR STATION.
    Eaker, R.W.
    Rochester, D.P.
    Hansen, C.A.
    Jevec, J.M.
    Lamanna, L.S.
    Dow, R.P.
    Nuclear Plant Journal, 1988, 6 (05) : 76 - 80
  • [3] STEAM GENERATOR MODAL ANALYSIS OF NUCLEAR POWER PLANT
    Yan, Lu
    Chu Qibao
    Qing, Wang
    Fan Yonggang
    PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 2, 2017,
  • [4] STEAM GENERATOR REPAIR AT NUCLEAR POWER PLANT.
    Cookson, D.L.
    Stoof, Jack H.H.
    Dominguez, Jorge Jimenez
    Chartered Mechanical Engineer, 1981, 28 (02): : 27 - 32
  • [5] Level control in the steam generator of a nuclear power plant
    Kothare, MV
    Mettler, B
    Morari, M
    Bendotti, P
    Falinower, CM
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2000, 8 (01) : 55 - 69
  • [6] Level control in the steam generator of a nuclear power plant
    Kothare, MV
    Mettler, B
    Morari, M
    Bendotti, P
    Falinower, CM
    PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 4851 - 4856
  • [7] Effects of curative and preventive chemical cleaning processes on fouled steam generator tubes in nuclear power plants
    Goujon, C.
    Pauporte, Th.
    Bescond, A.
    Mansour, C.
    Delaunay, S.
    Bretelle, J. -L.
    NUCLEAR ENGINEERING AND DESIGN, 2017, 323 : 120 - 132
  • [8] Distributed parameter modeling for the steam generator in the nuclear power plant
    Hui, Jiuwu
    Ling, Jun
    Dong, He
    Wang, Gaixia
    Yuan, Jingqi
    ANNALS OF NUCLEAR ENERGY, 2021, 152 (152)
  • [9] Steam Generator Replacement at the Obrigheim Nuclear Power Plant.
    Pickel, E.
    Schenk, H.
    Huemmeler, A.
    Atw. Atomwirtschaft, Atomtechnik, 1984, 29 (04): : 182 - 186
  • [10] STEAM-GENERATOR CHEMICAL CLEANING PROGRAM AT ARKANSAS-NUCLEAR-ONE
    LAWSON, BR