共 7 条
- [1] PILOT DEMONSTRATION OF THE BINARY COOLING TOWER ZERO DISCHARGE AT THE SUNRISE STATION. [J]. Combustion, 1980,
- [2] MAGMA COOLING-TOWER PROCESS PILOT PLANT DEMONSTRATION. [J]. Electric Power Research Institute, Coal Combustion Systems Division, (Report) EPRI CS, 1981, (1838):
- [3] Cooling Tower Collapse at Fiddlers Ferry Power Station. The Incident and Its Consequences. [J]. VGB-Kraftwerkstechnik, 1987, 67 (08): : 769 - 773
- [4] COOLING-TOWER AND FLUE-GAS DESULFURIZATION PLANT OF THE MODEL POWER-STATION AT VOLKLINGEN - PROPERTIES OF THE MIXED PLUME OF FLUE-GAS AND COOLING-TOWER PLUME [J]. STAUB REINHALTUNG DER LUFT, 1986, 46 (12): : 517 - 518
- [5] COOLING-TOWER AND FLUE-GAS DESULFURIZATION PLANT OF THE MODEL POWER-STATION VOLKLINGEN [J]. BRENNSTOFF-WARME-KRAFT, 1986, 38 (11): : 510 - 511
- [6] NATURAL DRAFT WET COOLING-TOWER OF THE NUCLEAR-POWER-STATION-PHILIPPSBURG (UNIT-2) [J]. BRENNSTOFF-WARME-KRAFT, 1984, 36 (7-8): : 313 - 313
- [7] THE NATURAL DRAFT WET COOLING-TOWER OF THE NUCLEAR-POWER STATION OF PHILIPPSBURG (UNIT 1) - INVESTIGATIONS ON THE OPERATIONAL BEHAVIOR, EMISSION AND SPREADING OF VAPOR [J]. BRENNSTOFF-WARME-KRAFT, 1983, 35 (7-8): : 356 - 358