共 16 条
- [3] MAIN RESULTS OF TESTING THE FURNACE CHAMBER OF THE TGMP-1202 BOILER OF THE 1200 MW POWER GENERATING UNIT. Thermal Engineering (English translation of Teploenergetika), 1985, 32 (08): : 454 - 458
- [10] Extending the load range of the TGMP-114 boiler and 300 MW generating unit under conditions of variable-pressure operation Thermal Engineering (English translation of Teploenergetika), 1988, 35 (06): : 321 - 326