共 50 条
- [1] NEW EQUIPMENTS FOR FDM CARRIER TERMINALS IN M4 CONSTRUCTION PRACTICE ERICSSON REVIEW, 1973, 50 (02): : 65 - 76
- [3] M25 ORBITAL ROAD, POYLE TO M4 - CONSTRUCTION PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1987, 82 : 291 - 307
- [6] A NEW M4 TRANSITION IN N=81 SERIES NUCLEI BULLETIN OF THE AMERICAN PHYSICAL SOCIETY, 1968, 13 (11): : 1467 - &
- [9] 30-CHANNEL PCM TERMINAL EQUIPMENT IN THE M5 CONSTRUCTION PRACTICE. Ericsson Review (English Edition), 1976, 53 (01): : 38 - 48
- [10] Use of temporary anchors in reinforced soil wall construction for the M4 motorway widening Australian Geomechanics Journal, 2017, 52 (04): : 79 - 88