Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems

被引:0
|
作者
Universitaet Osnabrueck, Osnabrueck, Germany [1 ]
机构
来源
Eur J Oper Res | / 2卷 / 214-226期
关键词
Algorithms - Computer simulation - Data processing - Resource allocation - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Resource-constrained scheduling problems with a fixed number of task types are considered in which, in addition, either the processing times are bounded or the number of processors is fixed. For problems with makespan, (weighted) mean flow time, weighted number of tardy tasks, and sum of tardiness as objective functions polynomial time algorithms are presented. These algorithms generalize results derived by Blazewicz et al. (1989) for makespan problems and solve open problems listed by Hoogeveen et al. (1994). Furthermore, results for shop problems with multiprocessor tasks and unit processing times, in which either the number of jobs or the number of stages is fixed, are derived.
引用
收藏
相关论文
共 50 条
  • [1] Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
    Brucker, P
    Kramer, A
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 214 - 226
  • [2] Review of Resource-Constrained Scheduling Algorithms
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (11)
  • [3] NEW PSEUDO POLYNOMIAL ALGORITHMS FOR A PARTIAL RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    Wei, Hanying
    Su, Zhixiong
    Qi, Jianxun
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2023, 19 (11) : 8271 - 8298
  • [4] Research on task scheduling algorithm in resource-constrained environments
    Lu C.
    Gong J.
    Zhu L.
    Liu Q.
    [J]. Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2021, 43 (12): : 3586 - 3593
  • [5] Resource-constrained scheduling of partitioned algorithms on processor arrays
    Dion, M
    Risset, T
    Robert, Y
    [J]. INTEGRATION-THE VLSI JOURNAL, 1996, 20 (02) : 139 - 159
  • [6] Resource-constrained scheduling of partitioned algorithms on processor arrays
    Ecole Normale Superieure de Lyon, Lyon, France
    [J]. Integr VLSI J, 2 (139-159):
  • [7] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [8] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    [J]. Sebt, M. H. (sebt@aut.ac.ir), 1600, Iran University of Science and Technology (11):
  • [9] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    Sebt, M. H.
    Zarandi, M. H. Fazel
    Alipouri, Y.
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2013, 11 (3A) : 189 - 198
  • [10] A polynomial algorithm for some preemptive multiprocessor task scheduling problems
    Kuszner, Lukasz
    Malafiejski, Michal
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (01) : 145 - 150