Assessing technology risk - a case study

被引:0
|
作者
Wilson Cent for Technology, Webster, United States [1 ]
机构
来源
Res Technol Manage | / 2卷 / 32-38期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Assessing technology risk - A case study
    Hartmann, GC
    Lakatos, AI
    RESEARCH-TECHNOLOGY MANAGEMENT, 1998, 41 (02) : 32 - 38
  • [2] Assessing Information Technology General Control Risk: An Instructional Case
    Norman, Carolyn Strand
    Payne, Mark D.
    Vendrzyk, Valaria P.
    ISSUES IN ACCOUNTING EDUCATION, 2009, 24 (01): : 63 - 72
  • [3] Assessing Technology Adoption at a University of Technology: A Case Study of Electronic Response Systems
    Tsumake, Onalenna P.
    Swart, Arthur J.
    PROCEEDINGS OF 2019 IEEE GLOBAL ENGINEERING EDUCATION CONFERENCE (EDUCON), 2019, : 183 - 188
  • [4] Assessing technology enhanced instruction: A case study in secondary science
    Woodrow, JEJ
    Mayer-Smith, JA
    Pedretti, EG
    JOURNAL OF EDUCATIONAL COMPUTING RESEARCH, 2000, 23 (01) : 15 - 39
  • [5] ASSESSING THE RISK OF ARIDITY - A CASE STUDY BUCHAREST ROMANIA
    Rusanescu, Carmen Otilia
    Rusanescu, Marin
    Begea, Mihaela
    Paraschiv, Gigel
    Biris, Sorin Stefan
    Voicu, Gheorghe
    Popescu, Ileana Nicoleta
    ACTUAL TASKS ON AGRICULTURAL ENGINEERING, 2018, 46 : 45 - 56
  • [6] Assessing the Risk of Fire Hazard: A Case Study of Delhi
    Bhatia, Kanika
    Upadhyay, Aakash
    5TH WORLD CONGRESS ON DISASTER MANAGEMENT, VOL. 2: Nature and Human Induced Disasters, 2023, : 498 - 512
  • [7] ASSESSING PROXIMITY TO FRUITION - A CASE-STUDY OF PHASES IN CASE TECHNOLOGY-TRANSFER
    CORBITT, GF
    NORMAN, RJ
    BUTLER, MC
    INTERNATIONAL JOURNAL OF SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING, 1991, 1 (02) : 189 - 201
  • [8] Assessing the Level of Physical Activity in the Workplace: A Case Study With Wearable Technology
    Narvaez, Pedro
    Manjarres, Jose
    Percybrooks, Winston
    Pardo, Mauricio
    Calle, Maria
    INTERNATIONAL JOURNAL OF INTERDISCIPLINARY TELECOMMUNICATIONS AND NETWORKING, 2019, 11 (01) : 44 - 56
  • [9] Assessing the risk of incorrect prediction - A nickel/cobalt case study
    Coombes, J
    Thomas, GS
    Gifford, M
    Jepsen, L
    MINE TO MILL 1998 CONFERENCE, 1998, 98 (04): : 63 - 68
  • [10] Assessing fluvial flood risk in urban environments: a case study
    Longo, Elisa
    Aronica, Giuseppe Tito
    Di Baldassarre, Giuliano
    Mukolwe, Micah
    3RD EUROPEAN CONFERENCE ON FLOOD RISK MANAGEMENT (FLOODRISK 2016), 2016, 7