共 4 条
- [1] Analysis of the Principal Scheme and Layout of the Main Hydropower Equipment at the Zagorsk Pumped-Storage Station Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 30 (04):
- [2] Optimal dispatch and benefit analysis of hydropower plant in electric power market ENERGY AND ENVIRONMENT, VOLS 1 AND 2, 2003, : 43 - 47
- [3] Cause Analysis of Plate Pitting Corrosion in Lubricating Oil Cooler of Main Equipment in Datang Weihe Thermal Power Plant ADVANCES IN CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING, PTS 1-5, 2013, 634-638 : 1677 - 1681
- [4] Design and Performance Analysis of Main Steam Coupled with Electric Heating Molten Salt Energy Storage System for Coal-Fired Power Plant 2024 IEEE 2ND INTERNATIONAL CONFERENCE ON POWER SCIENCE AND TECHNOLOGY, ICPST 2024, 2024, : 1405 - 1410