Schedule and Cost Control in Dwelling Construction using Control Charts

被引:0
|
作者
Marrero, Madelyn [1 ]
Fonseca, Antonio [2 ]
Falcon, Raúl [3 ]
Ramirez-De-Arellano, Antonio [1 ]
机构
[1] University of Seville, Department of Building Construction II, Ave. Reina Mercedes 4A, Seville, Spain
[2] Self-employed Technical Architect, Ave. Reina Mercedesa, Seville, Spain
[3] University of Seville, Department of Applied Mathematics I, Ave. Reina Mercedesa 4A, Seville, Spain
关键词
Construction contract - Construction manager - Construction projects - Cost controls - Production process - Simple modeling - Statistical control charts - Work breakdown system;
D O I
暂无
中图分类号
学科分类号
摘要
Methods to monitor the schedule and to control cost in dwelling construction projects are numerous and varied but commonly constitute an obstacle to a fast and agile response by construction managers, whose decisions require information to be comprehensive and summarized. A simple model to monitor these projects is proposed that can easily be implemented within control systems that are already in place. For the first time, process control charts are combined with cost control in dwelling construction in order to prevent overruns in terms of time and/or cost. The model facilitates the production supervision of construction contracts by regularly providing information on the work completed and the incurred cost of the production processes per period, through charting and/or summarizing this information in a manner consistent with statistical control charts. Finally, the manager can easily identify those processes which are off target by consulting control charts. © Marrero et al.; Licensee Bentham Open.
引用
收藏
页码:1 / 17
相关论文
共 50 条
  • [1] Schedule and cost control in dwelling construction using control charts
    Marrero, Madelyn
    Fonseca, Antonio
    Falcon, Raúl
    Ramirez-De-arellano, Antonio
    [J]. Open Construction and Building Technology Journal, 2014, 8 (01): : 63 - 79
  • [2] Controlling Project Schedule Progress, Using Control Charts
    Bancescu, Mioara
    [J]. CYBERNETICS AND SYSTEMS, 2016, 47 (07) : 602 - 615
  • [3] PLANNING OF HOUSING CONSTRUCTION USING CONTROL CHARTS
    PERERA, S
    RAMASWAMY, GS
    [J]. INTERNATIONAL JOURNAL FOR HOUSING SCIENCE AND ITS APPLICATIONS, 1980, 4 (05): : 447 - 458
  • [4] ON THE CONSTRUCTION OF CONTROL CHARTS USING LINGUISTIC VARIABLES
    WANG, JH
    RAZ, T
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (03) : 477 - 487
  • [5] Study of dynamic prediction and control about tunnel construction schedule and cost
    College of Economics and Management, Southwest Jiaotong University, Chengdu
    Sichuan
    610031, China
    不详
    Sichuan
    610031, China
    [J]. J. Railw. Eng. Soc., 1 (115-121):
  • [6] Research on Construction Schedule Control
    Ren Yilei
    Chen Jing
    [J]. CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT, 2010, : 1062 - +
  • [7] Statistic control of welding technological processes using the method of construction of charts of condition control
    Tararychkin, I.A.
    [J]. Avtomaticheskaya Svarka, 2001, (10): : 33 - 36
  • [8] THE CONSTRUCTION AND USE OF PATENTING CONTROL CHARTS
    TOROK, TE
    [J]. WIRE JOURNAL INTERNATIONAL, 1983, 16 (09): : 49 - 49
  • [9] THE CONSTRUCTION AND USE OF PATENTING CONTROL CHARTS
    TOROK, TE
    [J]. WIRE JOURNAL INTERNATIONAL, 1984, 17 (05): : 50 - 53
  • [10] PC PROGRAMS FOR THE CONSTRUCTION OF CONTROL CHARTS
    MESTEK, O
    [J]. CHEMICKE LISTY, 1994, 88 (05): : 309 - 313