共 50 条
- [1] Steam Turbine Installations at Power Plants in the Eleventh Five Year Plan Period. Teploenergetika, 1981, (05): : 4 - 7
- [10] Principal Lines of Development of Manufacture of High Parameter Power Plant Fittings in the Eleventh Five Year Plan Period. Energomashinostroenie, 1982, (09): : 5 - 7