共 50 条
- [1] Optimization Design of the Powerhouse at the Dam toe [J]. 2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 148 - 151
- [2] WELLS DAM .1. DAM COMBINES SPILLWAY AND POWERHOUSE [J]. CIVIL ENGINEERING, 1970, 40 (10): : 61 - &
- [6] Study on penstocks without expansion joint between dam and powerhouse in Three Gorges Project [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2003, (02):
- [7] UPLIFT AT TOE OF DAM OR FLOODBANK ON PERVIOUS FOUNDATION [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1970, 46 : 77 - &
- [8] Influence of welding time to circumferential seam reserved for connecting penstock in dam and powerhouse parting on spiral case with cushion layer [J]. Shi, C.-Z. (scz4@163.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (45): : 213 - 219
- [9] Research on the Optimization of Dam Foundation Seepage Control System [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1143 - 1148
- [10] Determination of rock pressure for underground powerhouse of Tehri Dam project [J]. SITE CHARACTERISATION PRACTICE, 2000, : 159 - 161