Research on optimization of connecting form between the dam and the powerhouse at the dam toe

被引:0
|
作者
Wu, Hailin [1 ]
Qin, Shihe [1 ]
Zhou, Yihong [1 ]
机构
[1] Hubei Provincial Key Laboratory of Construction and Management for Hydropower Project, China Three Gorges University, Yichang, Hubei 443002, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:156 / 160
相关论文
共 50 条
  • [1] Optimization Design of the Powerhouse at the Dam toe
    Niu Zhiguo
    Hu Shaowei
    [J]. 2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 148 - 151
  • [2] WELLS DAM .1. DAM COMBINES SPILLWAY AND POWERHOUSE
    PATRICK, JG
    [J]. CIVIL ENGINEERING, 1970, 40 (10): : 61 - &
  • [3] Deep Stability Evaluation of High-Gravity Dam under Combining Action of Powerhouse and Dam
    Su, Huaizhi
    Hu, Jiang
    Li, Jinyou
    Wu, Zhongru
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2013, 13 (03) : 257 - 272
  • [4] Optimization research for ash dam cross section
    Li, SY
    Zhao, JH
    Chen, YL
    Yang, JS
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2005, 36 (02) : 109 - 113
  • [5] Optimization of low-head, dam-toe, small hydropower projects
    Singal, S. K.
    Saini, R. P.
    Raghuvanshi, C. S.
    [J]. JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2010, 2 (04)
  • [6] Study on penstocks without expansion joint between dam and powerhouse in Three Gorges Project
    Lin, Shao-Zhong
    Liu, Ning
    Su, Hai-Dong
    [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2003, (02):
  • [7] UPLIFT AT TOE OF DAM OR FLOODBANK ON PERVIOUS FOUNDATION
    MUDD, DN
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1970, 46 : 77 - &
  • [8] Influence of welding time to circumferential seam reserved for connecting penstock in dam and powerhouse parting on spiral case with cushion layer
    Hu, Lei
    Shi, Chang-Zheng
    Wu, He-Gao
    Fu, Dan
    [J]. Shi, C.-Z. (scz4@163.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (45): : 213 - 219
  • [9] Research on the Optimization of Dam Foundation Seepage Control System
    Wang, Jun
    [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1143 - 1148
  • [10] Determination of rock pressure for underground powerhouse of Tehri Dam project
    Prasad, VVR
    Dwivedi, RD
    Dube, AK
    [J]. SITE CHARACTERISATION PRACTICE, 2000, : 159 - 161