An edge-prior DEM construction algorithm for open-pit coal mine

被引:0
|
作者
School of Mining, Liaoning Technical University, Fuxin [1 ]
123000, China
不详 [2 ]
123000, China
机构
来源
Meitan Xuebao | / 8卷 / 1827-1833期
关键词
D O I
10.13225/j.cnki.jccs.2014.1026
中图分类号
学科分类号
摘要
18
引用
下载
收藏
相关论文
共 50 条
  • [1] Optimized Transportation of the Open-pit Coal Mine
    Cai B.
    Hao J.
    Zhu H.
    Chen H.
    Journal of Engineering Science and Technology Review, 2022, 15 (04) : 90 - 95
  • [2] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648
  • [3] Update on open-pit coal mine blasting
    Adhikari, G.R.
    Gupta, R.N.
    Singh, R.B.
    Journal of Mines, Metals and Fuels, 1987, 35 (06): : 219 - 222
  • [4] Landslide mechanism and stability of an open-pit slope: The Manglai open-pit coal mine
    Chen, Tao
    Shu, Jisen
    Han, Liu
    Tovele, Gerson. S. V.
    Li, Baosheng
    FRONTIERS IN EARTH SCIENCE, 2023, 10
  • [5] Production schedule optimization in open-pit coal mine
    Gu, Xiao-Wei
    Xu, Xiao-Chuan
    Wang, Qing
    Zheng, You-Yi
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (08): : 1184 - 1187
  • [6] LANDSLIDE ON A FAULT IN AN OPEN-PIT COAL-MINE
    HANTZ, D
    LAVERSANNE, J
    LANDSLIDES, VOLS 1-3, 1988, : 655 - 659
  • [7] INTEGRATED OPEN-PIT COAL-MINE DESIGN
    BULLOCK, WD
    TOSNEY, JE
    MARTIN, PS
    CIM BULLETIN, 1976, 69 (768): : 55 - 62
  • [8] Open-Pit Mine Fine DEM Model Establishment and Updating
    Xu, Aigong
    Cui, Yang
    Sui, Xin
    NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 508 - 514
  • [9] Ultimate pit optimization with environmental problem for open-pit coal mine
    Xu, Xiaochuan
    Gu, Xiaowei
    Wang, Qing
    Zhao, Yunqi
    Zhu, Zhenguo
    Wang, Fengdan
    Zhang, Zaolin
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 173 : 366 - 372
  • [10] Construction and optimization method of the open-pit mine DEM based on the oblique photogrammetry generated DSM
    Wang, Jiaheng
    Wang, Liguan
    Jia, Mingtao
    He, Zhengxiang
    Bi, Lin
    MEASUREMENT, 2020, 152 (152)