共 50 条
- [1] Short-term optimal scheduling of cascaded hydropower stations based on sequential quadratic programming [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2010, 30 (SUPPL.): : 43 - 48
- [2] Optimal scheduling algorithm for head-dependent cascaded reservoirs [J]. Kongzhi yu Juece Control Decis, 6 (647-652):
- [3] Discussion on the short-term weekly optimal scheduling of cascade hydropower stations [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (04): : 38 - 42
- [6] Short-term scheduling of head-dependent hydro power systems: A quadratic optimization approach [J]. WSEAS Transactions on Systems, 2006, 5 (11): : 2575 - 2580
- [7] Mixed-Integer Nonlinear Programming for Head-Dependent Short-Term Hydro Scheduling [J]. 2009 INTERNATIONAL CONFERENCE ON POWER ENGINEERING, ENERGY AND ELECTRICAL DRIVES, 2009, : 90 - +
- [8] Optimal short-term operation of a cascade of hydropower stations [J]. HYDRAULIC ENGINEERING SOFTWARE VI, 1996, : 215 - 221
- [9] Head-dependent maximum power generation in short-term hydro scheduling using nonlinear programming [J]. PROCEEDINGS OF THE SEVENTH IASTED INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS, 2007, : 247 - +
- [10] Profit-based short-term hydro scheduling considering head-dependent power generation [J]. 2007 IEEE LAUSANNE POWERTECH, VOLS 1-5, 2007, : 1362 - +