Logistics and design considerations for cementing large casing strings in extended deviated wells: A case history

被引:0
|
作者
Denney, Dennis [1 ]
Latorre, Borja [1 ]
Bórquez, Carlos [2 ]
Delgado, Juan [2 ]
Lueje, Ariel [2 ]
机构
[1] YPF, Australia
[2] SPE, BJ Services, United States
来源
JPT, Journal of Petroleum Technology | 2009年 / 61卷 / 11期
关键词
(Edited Abstract);
D O I
10.2118/1109-0060-JPT
中图分类号
学科分类号
摘要
引用
收藏
页码:60 / 61
相关论文
共 21 条
  • [1] CEMENTING LARGE-SCALE DIAMETER CASING STRINGS THROUGH DRILLING PIPES
    SMIRNOV, AV
    ABRAMOV, AA
    KUKSOV, AK
    NEFTYANOE KHOZYAISTVO, 1988, (02): : 60 - 62
  • [2] MECHANICAL DESIGN CONSIDERATIONS FOR FRACTURE-TREATING DOWN CASING STRINGS.
    Clark, H.Craig
    SPE Drilling Engineering, 1987, 2 (02): : 116 - 126
  • [3] CEMENTING OIL AND GAS-WELLS .5. GUIDELINES FOR DOWNHOLE EQUIPMENT USE, STAGE CEMENTING METHODS, NEW CONCEPTS FOR CEMENTING LARGE DIAMETER CASING
    SUMAN, GO
    ELLIS, RC
    WORLD OIL, 1977, 185 (01) : 117 - 125
  • [4] Special Issues in the Stress Analysis of Casing Strings in Steam-Injection Wells: Mathematical Development and Design
    Garside, R.
    Pattillo, P. D.
    Pattillo, P. D., II
    Sathuvalli, U. B.
    SPE DRILLING & COMPLETION, 2009, 24 (01) : 89 - 95
  • [5] A design method of large-scale partial similar model test for cementing casing string system
    Qi, Linshan
    Yin, Yiyong
    Wang, Liyan
    Qu, Congfeng
    Liu, Guodong
    Li, Jun
    Liang, Dong
    Yang, Shuofei
    ALEXANDRIA ENGINEERING JOURNAL, 2025, 110 : 277 - 296
  • [6] A method for casing-centralizing design in extended-reach wells with optimized cement displacement efficiency
    Bu, Yuhuan
    Zhang, Daqian
    Guo, Quanqing
    Zhongguo Shiyou Daxue Xuebao (Ziran Kexue Ban)/Journal of China University of Petroleum (Edition of Natural Science), 2015, 39 (02): : 53 - 57
  • [7] Special Considerations in the Design Optimization of the Production Casing in High-Rate, Multistage-Fractured Shale Wells
    Sugden, C.
    Johnson, J.
    Chambers, M.
    Ring, G.
    Suryanarayana, P. V.
    SPE DRILLING & COMPLETION, 2012, 27 (04) : 459 - 472
  • [8] Mechanical model and optimal design method of tubular strings with connectors constrained in extended-reach and horizontal wells
    Huang, Wenjun
    Gao, Deli
    Liu, Yinghua
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2018, 166 : 948 - 961
  • [9] Real-Time Casing-Design Optimization: A Case Study in the Use of Managed-Pressure Drilling To Develop an Adaptive Well Design and Eliminate Casing Strings on a Deepwater Exploration Well
    Sugden, Catherine
    Bacon, William
    Gabaldon, Oscar
    Borges, Jose Umberto Arnaud
    Soares, Cristiane Maravilha
    Falcao, Jose Luiz
    Nogueira, Emmanuel Franco
    Vanni, Guilherme Siqueira
    Chita, Luiz Carlos
    SPE DRILLING & COMPLETION, 2014, 29 (04) : 386 - 404
  • [10] Ongoing Development of Cementing Practices and Technologies for Kuwait Oil Company's Deep HP/HT Exploration and Gas Wells: Case History
    Al-Saeedi, M. J.
    Al-Enezi, D.
    Al-Mudhaf, M. N. A.
    Modak, T.
    McKinnell, D. C.
    SPE DRILLING & COMPLETION, 2011, 26 (03) : 352 - 363