Analysis of shift schedule for the automatic transmission vehicle based on fuzzy neural network

被引:0
|
作者
State Key Laboratory of Mechanical Transmission, Chongqing University, Chongqing 400030, China [1 ]
机构
来源
Chongqing Daxue Xuebao | 2009年 / 8卷 / 897-903+914期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
相关论文
共 50 条
  • [1] Modeling and Analysis of Shift Schedule for Automatic Transmission Vehicle Based on Fuzzy Neural Network
    Li, Guanghui
    Hu, Jianjun
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 4839 - 4844
  • [2] Study of the Engineering Vehicles of Automatic Transmission Shift Schedule Based on Fuzzy Neural Network
    Huang, Yong Jing
    Yao, Jin
    Han, Jia Hua
    Wu, Di
    MANUFACTURING ENGINEERING AND AUTOMATION II, PTS 1-3, 2012, 591-593 : 1720 - 1723
  • [3] Shift Schedule of Automatic Transmission of Construction Vehicle Based on Matlab/Simulink
    Guan Liangjie
    Zhang Tiezhu
    Ma Yongzhic
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING AND INDUSTRIAL INFORMATICS (AMEII 2016), 2016, 73 : 436 - 439
  • [4] A study on the three parameter shift schedule of AMT vehicle based on dynamic fuzzy neural network
    Chen, Qinghong
    Qin, Datong
    Ye, Xin
    Qiche Gongcheng/Automotive Engineering, 2010, 32 (06): : 505 - 509
  • [5] Fuzzy neural network control in automatic transmission of construction vehicle
    Wu, Shijing
    Lu, Hongshan
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 2512 - +
  • [6] Fuzzy shift schedule of automatic mechanical transmission for tractors
    Henan University of Science and Technology, Luoyang 471003, China
    不详
    Nongye Jixie Xuebao, 2006, 11 (1-4):
  • [7] Optimal Efficiency Shift Schedule of Automatic Transmission for Construction Vehicle
    Kang, Huailiang
    Gong, Jie
    Zhao, Dingxuan
    Li, Tianyu
    AUTOMATION EQUIPMENT AND SYSTEMS, PTS 1-4, 2012, 468-471 : 2403 - 2408
  • [8] Development and Testing of an Automatic Transmission Shift Schedule Algorithm for Vehicle Simulation
    Newman, Kevin
    Kargul, John
    Barba, Daniel
    SAE INTERNATIONAL JOURNAL OF ENGINES, 2015, 8 (03) : 1417 - 1427
  • [9] Study on Fuzzy Automatic Transmission Schedule of Different Throttle Position for Vehicle
    Zhang, Zhiyi
    Sun, Bei
    Zhang, ChiZhong
    2012 WORLD AUTOMATION CONGRESS (WAC), 2012,
  • [10] Power-based Shift Schedule for Pure Electric Vehicle with a Two-speed Automatic Transmission
    Wang, Jiaqi
    Liu, Yanfang
    Liu, Qiang
    Xu, Xiangyang
    2016 SECOND INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND AUTOMATION SCIENCE (ICMEAS 2016), 2016, 157