Shop floor control in wafer fabrication based on drum-buffer-rope theory

被引:0
|
作者
Guo, Yong-Hui [1 ]
Qian, Xing-San [1 ]
机构
[1] Ctr. of Microelectronics Devmt., Univ. of Shanghai for S and T, Shanghai 200093, China
关键词
Silicon wafers;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:111 / 116
相关论文
共 50 条
  • [1] Time buffer control mechanism based on drum-buffer-rope for remanufacturing system
    College of Mechanical Science and Engineering, Jilin University, Changchun 130022, China
    不详
    Jilin Daxue Xuebao (Gongxueban), 2009, 5 (1197-1201):
  • [2] On the beat of the drum: improving the flow shop performance of the Drum-Buffer-Rope scheduling mechanism
    Thurer, Matthias
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3294 - 3305
  • [3] Drum-buffer-rope: The technique to plan and control the production using theory of constraints
    Bhardwaj, Arvind
    Gupta, Ajay
    Kanda, Arun
    World Academy of Science, Engineering and Technology, 2010, 69 : 103 - 106
  • [4] Dynamic production planning and scheduling system based on drum-buffer-rope theory
    Guo, YH
    Qian, XS
    Feng, Y
    PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 827 - 831
  • [5] Research on the Flexible Job Shop Scheduling Problem Using Drum-Buffer-Rope Approach
    Zhang, Guo-hui
    Wang, Yong-cheng
    PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING, VOL 1, 2016, : 911 - 919
  • [6] Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems
    Georgiadis, Patroklos
    Politou, Alexandra
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (04) : 689 - 703
  • [7] Drum-Buffer-Rope理论研究综述
    郭永辉
    工业工程与管理, 2008, (02) : 1 - 4+9
  • [8] Scheduling using drum-buffer-rope in a remanufacturing environment
    Air Force Inst of Technology, Wright-Patterson AFB, United States
    Int J Prod Res, 4 (1081-1091):
  • [9] Constraint management through the Drum-Buffer-Rope system
    Klusewitz, G
    Rerick, R
    1996 ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 96 PROCEEDINGS: THEME - INNOVATIVE APPROACHES TO GROWTH IN THE SEMICONDUCTOR INDUSTRY, 1996, : 7 - 12
  • [10] Scheduling using drum-buffer-rope in a remanufacturing environment
    Guide, VDR
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (04) : 1081 - 1091