共 50 条
- [1] Time buffer control mechanism based on drum-buffer-rope for remanufacturing system Jilin Daxue Xuebao (Gongxueban), 2009, 5 (1197-1201):
- [3] Drum-buffer-rope: The technique to plan and control the production using theory of constraints World Academy of Science, Engineering and Technology, 2010, 69 : 103 - 106
- [4] Dynamic production planning and scheduling system based on drum-buffer-rope theory PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 827 - 831
- [5] Research on the Flexible Job Shop Scheduling Problem Using Drum-Buffer-Rope Approach PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING, VOL 1, 2016, : 911 - 919
- [8] Scheduling using drum-buffer-rope in a remanufacturing environment Int J Prod Res, 4 (1081-1091):
- [9] Constraint management through the Drum-Buffer-Rope system 1996 ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 96 PROCEEDINGS: THEME - INNOVATIVE APPROACHES TO GROWTH IN THE SEMICONDUCTOR INDUSTRY, 1996, : 7 - 12