James Webb space telescope system cryogenic optical test plans

被引:0
|
作者
NASA Goddard Space Flight Center, Greenbelt, MD 20771, United States [1 ]
不详 [2 ]
不详 [3 ]
不详 [4 ]
机构
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Space telescopes
引用
收藏
相关论文
共 50 条
  • [1] James Webb Space Telescope System Cryogenic Optical Test Plans
    Feinberg, Lee D.
    Barto, Allison
    Waldman, Mark
    Whitman, Tony
    CRYOGENIC OPTICAL SYSTEMS AND INSTRUMENTS XIII, 2011, 8150
  • [2] Testing the Equipment for the Cryogenic Optical Test of the James Webb Space Telescope
    Whitman, Tony L.
    Dziak, K. J.
    Huguet, Jesse
    Knight, J. Scott
    Reis, Carl
    Wilson, Erin
    SPACE TELESCOPES AND INSTRUMENTATION 2014: OPTICAL, INFRARED, AND MILLIMETER WAVE, 2014, 9143
  • [3] Results, Status and Plans for the James Webb Space Telescope Optical Telescope Element
    Feinberg, Lee D.
    Keski-Kuha, Ritva
    Atkinson, Charlie
    Texter, Scott C.
    SPACE TELESCOPES AND INSTRUMENTATION 2010: OPTICAL, INFRARED, AND MILLIMETER WAVE, 2010, 7731
  • [4] Results, status and plans for the James Webb Space Telescope Optical Telescope Element
    NASA Goddard Space Flight Center, Greenbelt, MD, 20771, United States
    不详
    Proc SPIE Int Soc Opt Eng,
  • [5] New approach to cryogenic optical testing the James Webb Space Telescope
    Feinberg, Lee D.
    Hagopian, John. G.
    Diaz, Charles
    SPACE TELESCOPES AND INSTRUMENTATION I: OPTICAL, INFRARED, AND MILLIMETER, PTS 1 AND 2, 2006, 6265
  • [6] James Webb Space Telescope: large deployable cryogenic telescope in space
    Lightsey, Paul A.
    Atkinson, Charles
    Clampin, Mark
    Feinberg, Lee D.
    OPTICAL ENGINEERING, 2012, 51 (01)
  • [7] James Webb Space Telescope (JWST): Optical Performance of a Large Deployable Cryogenic Telescope
    Lightsey, Paul A.
    2014 CONFERENCE ON LASERS AND ELECTRO-OPTICS (CLEO), 2014,
  • [8] Optical assessment of the James Webb Space Telescope primary and secondary mirror cryogenic alignment with a Hartmann test
    Coyle, Laura E.
    Chonis, Taylor S.
    Smith, Koby Z.
    Knight, J. Scott
    Acton, D. Scott
    Howard, Joseph M.
    Feinberg, Lee D.
    ADVANCES IN OPTICAL AND MECHANICAL TECHNOLOGIES FOR TELESCOPES AND INSTRUMENTATION III, 2018, 10706
  • [9] Cryogenic optical test planning using the Optical Telescope Element Simulator with the James Webb Space Telescope Integrated Science Instrument Module
    Reichard, Timothy A.
    Bond, Nicholas A.
    Greeley, Bradford W.
    Malumuth, Eliot M.
    Melendez, Marcio
    Shiri, Ron
    de Oliveira, Catarina Alves
    Antonille, Scott R.
    Birkmann, Stephan
    Davis, Clinton
    Dixon, William V.
    Martel, Andre
    Miskey, Cherie L.
    Ohl, Raymond G.
    Sabatke, Derek
    Sullivan, Joseph
    OPTICAL SYSTEM ALIGNMENT, TOLERANCING, AND VERIFICATION X, 2016, 9951
  • [10] James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Pathfinder Status and Plans
    Feinberg, Lee D.
    Keski-Kuha, Ritva
    Atkinson, Charlie
    Booth, Andrew
    Whitman, Tony
    SPACE TELESCOPES AND INSTRUMENTATION 2014: OPTICAL, INFRARED, AND MILLIMETER WAVE, 2014, 9143