共 50 条
- [1] Model and algorithm for rolling planning of hot-rolled slab with reheating furnace production factors [J]. Kongzhi yu Juece/Control and Decision, 2022, 37 (07): : 1827 - 1836
- [2] NSGA-II for slab selecting and reheating furnace scheduling in hot rolling production [J]. PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 6776 - 6779
- [3] Multi-objective ACO algorithm for slab selecting and charging scheduling in hot rolling production [J]. 2015 IEEE INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER), 2015, : 703 - 708
- [6] Research on slab discharge planning model and algorithm for hot-rolling slab-yard [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (03): : 377 - 381
- [7] Study on Model and Method for Production Scheduling on Hot Rolling Section [J]. COMPUTER-AIDED DESIGN, MANUFACTURING, MODELING AND SIMULATION, PTS 1-2, 2011, 88-89 : 307 - 313
- [9] Production scheduling model and algorithm for steel making-continuous casting-hot rolling processes [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2003, 9 (01): : 33 - 36