共 50 条
The search for single-source
被引:0
|作者:
Building Solutions Group, Richard D. Kimball Company, Inc., Andover, MA
[1
]
机构:
来源:
关键词:
Budget control - Product design - Purchasing - Strategic planning - Sustainable development;
D O I:
暂无
中图分类号:
学科分类号:
摘要:
The advantages of D-B process in providing single-source responsibility, building team participation, and aiming for project delivery through sustainable teamwork, are presented. The D-B team is based on job-by-job basis and single-source responsibility, in building various stems for the project completion. A D-B team steps include concept and cost options, project design-budget intent confirmation, authorization to proceed, and finalizing and purchasing equipment. The steps for the completion of D-B project also include complete field coordination, startup of equipment with client, commissioning systems with client, initiating first-year PM plan, and trend, access, and report on project content during the warranty phase. These steps create a better solution for less money while providing design intent, team performance, and final product for the D-B project.
引用
收藏
相关论文