High Precision Cutting Length Calculation Method and Application of Special-shaped Steel Pylon with Closure Segment

被引:0
|
作者
Wang S. [1 ]
Ke Z. [1 ]
Gao Y. [1 ]
Li Y. [2 ]
Yang B. [3 ]
机构
[1] China Academy of Railway Sciences Co., Ltd., Beijing
[2] Beijing Gonglian Highway Connection Line Company Limited, Beijing
[3] Beijing General Municipal Engineering Design & Research Institute Co., Ltd., Beijing
来源
关键词
Closure control; Cutting length; Deformation; Posture optimization; Special-shaped steel pylon; Temperature field;
D O I
10.11908/j.issn.0253-374x.19223
中图分类号
学科分类号
摘要
An accurate cutting length calculation method for space-warped closure segment which considers the erection deviation of closure port was proposed. To obtain the optimization model drived by the internal penalty function method and calculate the ridge line cutting length of closure segment accurately, an objective function with distance between the characteristic points of closure port and the ridge lines of closure segment was constructed, and the constraints of the erection deviation of the closure segment were satisfied. The closure time was determined by the correlation analysis of the temperature field and deformation with 72 h measured data. The temperature influence correction method of the cutting length was proposed based on weather forecast and the correlation analysis on temperature field and ambient temperature. The steel pylon closure with zero additional stress and high precise came into fact due to closure segment cutting calculation method based on the coordinates of multi-feature points. © 2020, Editorial Department of Journal of Tongji University. All right reserved.
引用
收藏
页码:358 / 367
页数:9
相关论文
共 21 条
  • [1] Zhang P., Fan L., Research on aesthetics planning of series bridges over urban rivers, Journal of Tongji University: Natural Science, 35, 12, (2007)
  • [2] Yu Z., Status and development of bridge aesthesis design, Urban Roads Bridges & Flood Control, 6, (2018)
  • [3] Tang M.-C., Forms and aesthetics of bridges, Engineering, 4, 2, (2018)
  • [4] Wang H., Fang X., Bai L., Et al., Erection of steel pylons of cable-stayed bridges and suspension bridges, Railway Engineering, 7, (2007)
  • [5] Liu X., Wei X., Jia W., Comparison and selection of installation schemes for super large water arched steel pylons over the rivers, Highway, 7, (2014)
  • [6] Pan J., Xu Y., Key techniques for construction of main girder and pylons of Jiuzhou Ship Channel Bridge of Hong Kong-Zhuhai-Macao Bridge, Bridge Construction, 46, 6, (2016)
  • [7] Yu X., Chen D., Construction control techniques for closure of steel truss girder of Yachi River Bridge on Guiyang-Qianxi Expressway, Bridge Construction, 47, 6, (2017)
  • [8] Zhang Y., Di J., Chang Y., Et al., Techniques for closure of steel box girder of Daxie 2nd Bridge, Highway, 9, (2013)
  • [9] Gou H., Pu Q., Han B., Et al., Study on construction control of long-span V-shape rigid frame composite arch bridge, China Civil Engineering Journal, 46, (2013)
  • [10] Yi Y., Yan H., Zhao K., Et al., Technique of cutting-pushing closure for north main bridge of Xiazhang Sea-Crossing Bridge, Bridge Construction, 43, 4, (2013)