Construction technology of cast-in-situ flue sheet for the tunnel at West Changjiang Road

被引:0
|
作者
机构
[1] Hu, Tianbao
来源
Hu, Tianbao | 1600年 / Editorial By Modern Tunnelling Technology, China卷 / 51期
关键词
D O I
10.13807/j.cnki.mtt.2014.S1.067
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 42 条
  • [1] CAST-IN-SITU CONSTRUCTION
    不详
    CONCRETE, 1968, 2 (06): : 261 - &
  • [2] New technology of cast-in-situ construction without shuttering
    Poteryaev-Shajdurov, I.I.
    Promyshlennoe i Grazhdanskoe Stroitel'stvo, 2002, (04):
  • [3] Construction technology of cast-in-situ bored pile in deep water
    Hui, Liu
    Electronic Journal of Geotechnical Engineering, 2015, 20 (17): : 9837 - 9844
  • [4] Designing cast-in-situ FRC tunnel linings
    Chiaia, B.
    Fantilli, A. P.
    Vallini, P.
    TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 65 - 65
  • [6] Research on Construction Technology of cast-in-situ bored pile under Complex Geological Conditions
    Wu, Y. H.
    Zhou, Z.
    Chen, W. Q.
    Liu, S. Y.
    Zhang, B. C.
    Huang, H. F.
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [7] Issues on the Construction Process of Punched Cast-in-Situ Piles
    Jiang, Fengfei
    Wang, Shengli
    Zhang, Xiaoli
    Wang, Zhaoxin
    Liu, Long
    He, Feifei
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2398 - 2401
  • [8] LIFE CYCLE ASSESSMENT OF PRECAST AND CAST-IN-SITU CONSTRUCTION
    Dong, Y. H.
    Jaillon, L.
    Poon, C. -S.
    EXPANDING BOUNDARIES: SYSTEMS THINKING IN THE BUILT ENVIRONMENT, 2016, : 426 - 429
  • [9] Technology of Cast-in-Situ Inclined Outer Walls Erection
    Markouski, Mikhail F.
    Turavets, Ryhor A.
    ADVANCED CONSTRUCTION 2010, 2010, : 177 - 182
  • [10] New equipment and technology of installation of cast-in-situ piles
    Martyuchenko, I.G.
    Kravchenko, D.V.
    Mekhanizatsiya Stroitel'stva, (11): : 21 - 22