Minimizing the makespan for unrelated parallel machines

被引:0
|
作者
School of Computing, National University of Singapore, 3 Science Drive 2, Singapore 117543, Singapore [1 ]
不详 [2 ]
不详 [3 ]
机构
来源
Int. J. on Artif. Intell. Tools | 2007年 / 3卷 / 309-415期
关键词
11;
D O I
10.1142/s0218213007003175
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Minimizing the makespan for unrelated parallel machines
    Guo, Yunsong
    Lim, Andrew
    Rodrigues, Brian
    Yang, Liang
    INTERNATIONAL JOURNAL ON ARTIFICIAL INTELLIGENCE TOOLS, 2007, 16 (03) : 399 - 415
  • [2] Minimizing Makespan on Identical Parallel Machines
    Habiba, Houari
    Hassam, Ahmed
    Sari, Zaki
    Amine, Cherier Mohamed
    Souad, Tahraoui
    2019 3RD INTERNATIONAL CONFERENCE ON APPLIED AUTOMATION AND INDUSTRIAL DIAGNOSTICS (ICAAID 2019), 2019,
  • [3] Minimizing makespan on parallel machines with batch arrivals
    Chung, Tsui-Ping
    Liao, Ching-Jong
    Lin, Chien-Hung
    ENGINEERING OPTIMIZATION, 2012, 44 (04) : 467 - 476
  • [4] Minimizing makespan on parallel batch processing machines
    Chang, PY
    Damodaran, P
    Melouk, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (19) : 4211 - 4220
  • [5] A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines
    Chen, Chun-Lung
    Chen, Chuen-Lung
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) : 3073 - 3081
  • [6] Makespan minimization on unrelated parallel machines with a few bags
    Page, Daniel R.
    Solis-Oba, Roberto
    THEORETICAL COMPUTER SCIENCE, 2020, 821 : 34 - 44
  • [7] An effective heuristic for minimising makespan on unrelated parallel machines
    Srivastava, B
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (08) : 886 - 894
  • [8] A LISTFIT heuristic for minimizing makespan on identical parallel machines
    Gupta, JND
    Ruiz-Torres, J
    PRODUCTION PLANNING & CONTROL, 2001, 12 (01) : 28 - 36
  • [9] Lagrangian relaxation approach to minimizing makespan in hybrid flow shop scheduling problem with unrelated parallel machines
    Asadi-Gangraj, E.
    SCIENTIA IRANICA, 2018, 25 (06) : 3765 - 3775
  • [10] MINIMIZING MAXIMUM TARDINESS FOR UNRELATED PARALLEL MACHINES
    SURESH, V
    CHAUDHURI, D
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 34 (02) : 223 - 229