Development and application of automatic surveying system in shield tunneling

被引:1
|
作者
Pan G. [1 ,2 ]
Wang S. [1 ]
Chen C. [3 ]
Zhang D. [3 ]
机构
[1] Department of Surveying and Geo-Informatics, Tongji university
[2] Key Laboratory of Modern Engineering Surveying of SBSM
[3] Shanghai Metro Shield Equipment and Engineering Co. Ltd.
来源
关键词
Automatic total station; Automatic-guiding survey; Shield-driven; Visualization;
D O I
10.3969/j.issn.0253-374x.2010.03.027
中图分类号
学科分类号
摘要
By synthesizing the advantages of various surveying systems at home and abroad, a simply-operated highly automatic visual surveying system was developed with a characteristic of automatic shield tunneling guiding survey visualization and engineering dynamic management visualization. The system was applied to the railway construction. Result shows that the surveying system is convenient, accurate and feasible to automatically accomplish the whole measurement task. Based on the visual information of the correlations offered by the system about the TPM site and the building around, accidents caused by surroundings during the tunnel construction can be avoided.
引用
收藏
页码:459 / 463
页数:4
相关论文
共 7 条
  • [1] Zhou W., Shield Tunneling Technology, (2004)
  • [2] Liu J., Zhang Y., Pan Z., Tunneling Project, (1999)
  • [3] Yu B., Chen Y., Guo X., Inertial Technology, (1994)
  • [4] Zhang H., Gu L., On the measurement and the method of computation of the posture parameters of shields, Modern Tunnelling Technology, 2, (2004)
  • [5] Pan G., Wang S., Breakthrough measurement for shanghai No. 2 subway tunnel, Journal of Tongji University: Natural Science, 28, 1, (2000)
  • [6] Pan G., Wang S., Research on surveying methods in subway construction, Bulletin of Surveying and Mapping, 1, (2001)
  • [7] Pan G., Che J., The measurement technology in the construction of subway, Jiangxi Science, 24, 4, (2006)