Real-time simulation test for secondary system of ± 660 kV HVDC power transmission demonstration project from Ningdong to Shandong and countermeasures to key problems

被引:0
|
作者
Pu, Ying [1 ]
Shu, Chang [2 ]
Jiang, Weiyong [1 ]
Shi, Yan [1 ]
Hao, Junfang [3 ]
Tao, Yu [1 ]
Ma, Weimin [1 ]
Yin, Weiyang [1 ]
机构
[1] State Grid DC Project Construction Company Limited, Xicheng District, Beijing 100052, China
[2] School of Electrical and Electronic Engineering, North China Electric Power University, Changping District, Beijing 102206, China
[3] Xuji Group Company Limited, Xuchang 461000, Henan Province, China
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:76 / 83
相关论文
共 4 条
  • [1] Deblock logic for ± 660 kV DC power transmission project from Ningdong to Shandong
    Yang, Peng
    Yang, Jing
    Wang, Liang
    Dianwang Jishu/Power System Technology, 2011, 35 (03): : 90 - 93
  • [2] Transient rating calculation of AC filters in ±660 kV HVDC transmission project from Ningdong to Shandong
    Dan, Gang
    Li, Ming
    Yang, Jun
    Gaodianya Jishu/High Voltage Engineering, 2010, 36 (06): : 1583 - 1588
  • [3] Operational tests of thyristor valves for ±660 kV DC power transmission project from Ningdong to Shandong
    China Electric Power Research Institute, Haidian District, Beijing 100192, China
    Dianwang Jishu, 2012, 2 (13-16):
  • [4] Real-Time Countermeasures Preventing Power System Instability by using PMU data from RTDS simulation
    Karatas, Bahtiyar Can
    Johannsson, Hjortur
    Nielsen, Arne Hejde
    2016 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2016, : 1787 - 1791