Research on reliability of advanced geological forecasting for tunnel construction

被引:0
|
作者
Ye, Ying [1 ]
机构
[1] Beijing Municipal Engineering Research Institute, Beijing 100037, China
关键词
Forecasting;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:66 / 71
相关论文
共 50 条
  • [1] The application of geological advanced prediction in tunnel construction
    Lu Youzhong
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [2] The application of Geological radar in forecasting the adverse geological in metamorphic rock area tunnel construction
    Xia, Jiangtao
    Yang, Chengzhong
    Wang, Shufang
    ADVANCED RESEARCH ON MATERIAL ENGINEERING, CHEMISTRY, BIOINFORMATICS II, 2012, 531 : 543 - +
  • [3] State of art and trends of advanced geological prediction in tunnel construction
    Li, S. (lishucai@sdu.edu.cn), 1600, Academia Sinica (33):
  • [4] Study on the Suitability of Advanced Geological Prediction Methods for TBM Tunnel Construction
    Fu, Wei
    Zhang, Wenzhong
    Liu, Zhengyu
    Zhao, Wen
    Lu, Song
    Chen, Xingqiang
    Wang, Huajiang
    Cai, Shaofeng
    Journal of Railway Engineering Society, 2023, 40 (10) : 81 - 85
  • [5] Research on the engineering construction geological condition of Qingdao Jiaozhou Bay Tunnel
    Ma, Ruo-Fei, 1600, Editorial Department of Journal of Railway Engineering Society, China (31):
  • [6] Application of TSP and Advanced Drilling Geological Prediction Technology in Construction of Qiyueshan Tunnel
    Rao, Xinping
    Yi, Wa
    Sun, Hui
    Zhang, Zhenhua
    ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 493 - 499
  • [7] Geological forecasting technology at tunnel excavation safety
    Ye, Y
    Wang, MS
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 767 - 772
  • [8] Research on the Advanced Prediction Model of the Tunnel Geological Radar Based on Cluster Computing
    Wei, Meng
    Zhang, Ningxin
    Tong, Yuan
    Song, Yu
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2020, 26 (03): : 597 - 607
  • [10] Predicting geological hazards during tunnel construction
    Li, Shucai
    Li, Shuchen
    Zhang, Qingsong
    Xue, Yiguo
    Liu, Bin
    Su, Maoxin
    Wang, Zhechao
    Wang, Shugang
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2010, 2 (03) : 232 - 242