Optimization based control of overcurrent relays in distribution network considering real-time measurements: A case study

被引:1
|
作者
Unluturk, Ali [1 ]
Ozer, Ishak [1 ,2 ]
机构
[1] Erzurum Tech Univ, Dept Elect & Elect Engn, TR-25100 Erzurum, Turkiye
[2] ARAS Elect Distribut Inc Co, Relay Measurement Test Unit, TR-25100 Erzurum, Turkiye
关键词
Overcurrent relay coordination; Electricity distribution network; Metaheuristic optimization methods; Power system measurements; OPTIMAL COORDINATION; ALGORITHM;
D O I
10.1016/j.apenergy.2024.124439
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The coordination time interval (CTI) is very important in the coordination of overcurrent relays (OCRs). Although the CTI constraint is usually taken as 0.2 in the literature, it is also stated that it can be taken at different values. In the relay coordination carried out on a real power system serving in Erzurum/Turkey, the triping delay times (TDT) of OCRs and the contact opening delay times (CODT) of circuit breakers (CB) were measured and the CTI constraints in the coordination were determined according to the obtained measurements. This coordination process was transformed into an objective function (OF). This OF was solved with metaheuristic optimization algorithms. The Dandelion Optimization (DO) solution is better than spider wasp, golden jackal, zebra and dingo based optimization. Then, time multiplier setting (TMS) values are obtained from OF according to the CTI value determined according to the proposed real-time measurement and the CTI = 0.2 value frequently preferred in the literature. The performance of the relay TMS values obtained according to the proposed and classical methods was compared. Considering the power model and solution, 18.67% improvement in the operation times of the relays was achieved in Relay 2, 11.67% in Relay 3, 19.94% in Relay 4, 28.6% in Relay 6 and 23.31 % in Relay 7. The TMS value of Relay 5 is the same for the proposed and the classical method. As a result, the fast operation, reliability and selectivity of the power system were improved by ensuring correct relay coordination with the proposed method.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Communicationless Overcurrent Relays Coordination for Active Distribution Network Considering Fault Repairing Periods
    Elsadd, Mahmoud A.
    Zobaa, Ahmed F.
    Khattab, Heba A.
    Abd El Aziz, Ahmed M.
    Fetouh, Tamer
    Georgilakis, Pavlos S.
    ENERGIES, 2023, 16 (23)
  • [2] Planning the coordination of overcurrent relays for distribution systems considering network reconfiguration and load restoration
    Sharma, Ankita
    Kiran, Deep
    Panigrahi, Bijaya K.
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (07) : 1672 - 1679
  • [3] Comparison of non-real-time and real-time simulators with relays in-the-loop for adaptive overcurrent protection
    Piesciorovsky, Emilio C.
    Schulz, Noel N.
    ELECTRIC POWER SYSTEMS RESEARCH, 2017, 143 : 657 - 668
  • [4] Optimal coordination of directional overcurrent relays in distribution systems based on network splitting
    Azari, Afshin
    Akhbari, Mahdi
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2015, 25 (10): : 2310 - 2324
  • [5] Integrating Distributed Intelligence in Active Distribution Systems: A Voltage Control Case Study Considering Real-Time Pricing
    Wang, Xiaoxue
    Xu, Tao
    Wang, Chengshan
    Guo, Lingxu
    Zhai, Xiaolei
    Han, Liu
    Peng, Zhuyi
    2016 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2016,
  • [6] Economic optimization of smart distribution networks considering real-time pricing
    Zhang, Hong
    Zhao, Dongmei
    Gu, Chenghong
    Li, Furong
    Wang, Bo
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2014, 2 (04) : 350 - 356
  • [7] Real-Time Optimization of Distribution System Considering Interaction Between Markets
    Khanabadi, Mojtaba
    Moghadasi, Seyedmahdi
    Kamalasadan, Sukumar
    2013 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, 2013,
  • [8] Overcurrent relay optimization in a radial distribution network considering different fault locations
    Michele Rojnić
    Rene Prenc
    Danijel Topić
    Nicoletta Saulig
    Electrical Engineering, 2023, 105 : 1093 - 1109
  • [9] Overcurrent relay optimization in a radial distribution network considering different fault locations
    Rojnic, Michele
    Prenc, Rene
    Topic, Danijel
    Saulig, Nicoletta
    ELECTRICAL ENGINEERING, 2023, 105 (02) : 1093 - 1109
  • [10] Overcurrent relays coordination considering transient behaviour of fault current limiter and distributed generation in distribution power network
    Chabanloo, R. M.
    Abyaneh, H. A.
    Agheli, A.
    Rastegar, H.
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2011, 5 (09) : 903 - 911