Expanding Transmission Capacity: Examples of Regulatory Paths for Five Alternative Strategies

被引:0
|
作者
Reed L. [1 ]
Dworkin M. [2 ]
Vaishnav P. [1 ]
Morgan M.G. [1 ]
机构
[1] Department of Engineering and Public Policy, Carnegie Mellon University, 5000 Forbes Avenue, Pittsburgh, 15224, PA
[2] Vermont Law School, 164 Chelsea St, South Royalton, 05068, VT
来源
Electricity Journal | 2020年 / 33卷 / 06期
基金
美国国家科学基金会; 美国安德鲁·梅隆基金会;
关键词
Electricity Transmission; HVDC; Regulation; Right-of-way; Siting;
D O I
10.1016/j.tej.2020.106770
中图分类号
学科分类号
摘要
Transmission capacity expansion using existing lines and rights-of-way (ROW) is a strategy that deserves greater attention. The need to acquire siting approval and ROW for a new line can increase a project timeline by many years, and in some cases may even lead to project cancellation. Projects that use or expand an existing ROW face different regulatory pathways and typically result in different responses from the public and other entities than those that involve siting an entirely new line. In order to identify and compare some of the issues that arise in reconductoring existing lines, expanding rights of way for existing lines, and building entirely new lines, we obtained input from a number of PUCs and siting authorities across the United States, reviewed a large number of projects, and identified the types of approvals that different types of projects can expect. In this paper, we develop a taxonomy of technical strategies that can be used to increase the capacity in an existing transmission corridor and identify the regulatory and other issues that must be addressed in each case. We compare these options with that of building an entirely new line and illustrate the various strategies with examples drawn from U.S. transmission projects that have been undertaken over the past 20 years. © 2020 The Authors
引用
收藏
相关论文
共 50 条
  • [1] ALTERNATIVE STRATEGIES FOR EXPANDING STATE REGULATORY PROTECTION FOR THE AGING
    LAMMERS, WW
    GERONTOLOGIST, 1985, 25 : 13 - 14
  • [2] Expanding transmission capacity: A proposed planning process
    Hirst, Eric
    Kirby, Brendan
    Electricity Journal, 2002, 15 (08): : 54 - 59
  • [3] Preparing for the Next Pandemic - Expanding and Coordinating Global Regulatory Capacity
    Halabi, Sam
    O'Hara, George L.
    NEW ENGLAND JOURNAL OF MEDICINE, 2024, 391 (06): : 484 - 487
  • [4] Parents and the Preschool PATHS (Promoting Alternative Thinking Strategies) curriculum
    Kelly, Barbara
    Edgerton, Carole
    Graham, Seonaid
    Robertson, Elaine
    Syme, Barry
    JOURNAL OF CHILDRENS SERVICES, 2015, 10 (03) : 231 - 241
  • [5] The ethanol industry in the United States: Rapidly expanding capacity, but regulatory uncertainty
    Richman, S
    INTERNATIONAL SUGAR JOURNAL, 2004, 106 (1263): : 138 - 140
  • [6] THE EFFECTS OF ALTERNATIVE REGULATORY POLICIES ON UTILITY INVESTMENT STRATEGIES
    RAFFIEE, K
    WENDEL, J
    SOUTHERN ECONOMIC JOURNAL, 1988, 54 (04) : 840 - 854
  • [7] Paths to scaling-up: Alternative strategies for local nongovernmental organizations
    Uvin, P
    Miller, D
    HUMAN ORGANIZATION, 1996, 55 (03) : 344 - 354
  • [8] Is Deferrable Demand an Effective Alternative to Upgrading Transmission Capacity?
    Lamadrid, Alberto J.
    Mount, Timothy D.
    Jeon, Wooyoung
    Lu, Hao
    JOURNAL OF ENERGY ENGINEERING, 2015, 141 (01)
  • [9] Social Competence and Promoting Alternative Thinking Strategies - PATHS Preschool Curriculum
    Arda, Tugce Burcu
    Ocak, Sakire
    KURAM VE UYGULAMADA EGITIM BILIMLERI, 2012, 12 (04): : 2691 - 2698
  • [10] EVALUATION OF ALTERNATIVE STRATEGIES FOR EXPANDING NUMBER OF BLACK-OWNED BUSINESSES
    BRADFORD, W
    BATES, T
    REVIEW OF BLACK POLITICAL ECONOMY, 1975, 5 (04): : 376 - 385