Nuclear safety management and control on material issue of leak-tight liner of ling'ao nuclear power plant unit 3

被引:0
|
作者
Guangdong Regional Office of State Environment Protection Administration of China, Guangdong 518124, China [1 ]
机构
来源
Hedongli Gongcheng | 2006年 / 5卷 / 91-93期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Application of DCS in Ling'ao nuclear power plant
    Liu, Jichun
    Wang, Ye
    Wang, Fuqiang
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2010, 30 (06): : 105 - 110
  • [6] NUCLEAR-POWER PLANT SAFETY AT ISSUE
    不详
    CHEMICAL & ENGINEERING NEWS, 1972, 50 (04) : 16 - &
  • [7] Analysis of turbine fire protection system of Ling'ao Nuclear Power Plant Phase II
    China Nuclear Power Engineering Co. Ltd., Shenzhen, Guangdong, 518124, China
    Hedongli Gongcheng, 2009, SUPPL. 2 (23-25): : 23 - 25
  • [9] Research on the Cognitive Reliability Model of DCS plus SOP in the Ling'ao Phase II Nuclear Power Plant's Main Control Room
    Liu Yanzi
    Zhang Xuegang
    Zhang Gang
    Jiang Jianjun
    Zhang Li
    Hu Hong
    Qing Tao
    Zou Yanhua
    Yang Dan
    Xi Liaozi
    Tang Fan
    Jia Ming
    Wu Yiqian
    Liu Zhiyao
    NUCLEAR TECHNOLOGY, 2021, 207 (01) : 74 - 93
  • [10] Discussion on software aging management of nuclear power plant safety digital control system
    Liang, Huihui
    Gu, Pengfei
    Tang, Jianzhong
    Chen, Weihua
    Gao, Feng
    SPRINGERPLUS, 2016, 5