Monitoring and Assessment of Mechanical Response of Large-Scale Prefabricated Structures in Underground Subway Stations During Construction Process

被引:0
|
作者
Hong, Chengyu [1 ,2 ,3 ]
Rao, Wei [1 ,2 ,3 ]
Qiu, Tong [1 ,2 ,3 ]
Chen, Xiangsheng [1 ,2 ,3 ]
Dai, Ji [4 ]
Li, Mengting [6 ]
Chen, Weibin [1 ,2 ,3 ]
Wu, Chenggang [5 ]
机构
[1] College of Civil and Transportation Engineering, Shenzhen University, Guangdong, Shenzhen,518060, China
[2] Key Laboratory of Green, Efficient and Intelligent Construction of Shenzhen Metro Underground Station, Guangdong, Shenzhen,518060, China
[3] Key Laboratory of Coastal Urban Resilience Infrastructure, Ministry of Education, Guangdong, Shenzhen,518060, China
[4] Shenzhen Metro Group Co. Ltd, Guangdong, Shenzhen,518038, China
[5] Shenzhen Municipal Design and Research Institute Co. Ltd, Shenzhen,518029, China
[6] Beijing Urban Engineering Design and Research Institute Co. Ltd, Beijing,100037, China
来源
SSRN | 2023年
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
Roofs - Subway stations
引用
收藏
相关论文
共 26 条
  • [1] Monitoring and assessment of mechanical response of large-scale prefabricated structures in underground subway stations during construction process
    Hong, Chengyu
    Rao, Wei
    Qiu, Tong
    Chen, Xiangsheng
    Dai, Ji
    Wu, Chenggang
    Li, Mengting
    Chen, Weibin
    [J]. MEASUREMENT, 2024, 235
  • [2] Numerical Simulation and Evaluation of Construction Process on Large-scale Underground Plants
    Zuo, Shuangying
    Wang, Xingjian
    [J]. 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [3] Process monitoring during manufacturing of large-scale composite parts
    Heider, D
    Eckel, DA
    Don, RC
    Fink, BK
    Gillespie, JW
    [J]. PROCESS MONITORING WITH OPTICAL FIBERS AND HARSH ENVIRONMENT SENSORS, 1999, 3538 : 226 - 236
  • [4] Mechanical properties of large-scale composite structures according to process conditions
    Park, Chang Wook
    Yoon, Sung Won
    [J]. INTERNATIONAL JOURNAL OF MODERN PHYSICS B, 2021, 35 (14N16):
  • [5] Analysis and evaluation system of rapid monitoring of large-scale underground cavern group during construction period in Southwest China
    Cai, Dewen
    Wang, Dikai
    Chen, Xiaopeng
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (11): : 2341 - 2350
  • [6] In Situ Monitoring and Numerical Experiments on Vertical Deformation Profiles of Large-Scale Underground Caverns in Giant Hydropower Stations
    Wu, Hao
    Liu, Jian
    Wang, Xiaogang
    Liu, Lipeng
    Tian, Zhenhua
    [J]. GEOFLUIDS, 2021, 2021
  • [7] Research on 4D simulation and application for construction process of large-scale underground powerhouse
    Zhong, DH
    Yang, XG
    Liu, KJ
    Hu, CS
    Li, MC
    [J]. PROCEEDINGS OF THE CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY, VOL 1, NO 1, 2004, : 302 - 307
  • [8] Early construction cost and time risk assessment and evaluation of large-scale underground cavern construction projects in Singapore
    Maruvanchery, Varun
    Zhe, Shao
    Robert, Tiong Lee Kong
    [J]. UNDERGROUND SPACE, 2020, 5 (01) : 53 - 70
  • [9] Sparse Sensor Array Based Damage Monitoring and Assessment for Large-scale Structures
    Qiu, Wen
    Bao, Cheng
    Bao, Qiao
    Hu, Weiwei
    Wang, Qiang
    [J]. 2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 4380 - 4384
  • [10] Study on dynamic stability of large-scale underground cavern group during construction period of hydropower station
    Nie, Weiping
    Shi, Chong