共 50 条
- [1] Driving cycle construction methodology of city road based on markov process Nongye Jixie Xuebao/Transactions of the Chinese Society of Agricultural Machinery, 2009, 40 (11): : 26 - 30
- [2] Driving Cycle Construction of City Road for Hybrid Bus Based on Markov Process PROCEEDINGS OF THE 2015 INTERNATIONAL INDUSTRIAL INFORMATICS AND COMPUTER ENGINEERING CONFERENCE, 2015, : 1159 - 1164
- [3] Construction and analysis of city driving cycle by clustering analysis ICIC Express Letters, 2014, 8 (11): : 3041 - 3045
- [4] Research on the Construction Method of Urban Compound Driving Cycle with Curved Road Information Qiche Gongcheng/Automotive Engineering, 2021, 43 (10): : 1519 - 1527
- [5] Research on Construction of City Road Greening SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 800 - 803
- [6] Study on the driving cycle construction for city hybrid bus PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS RESEARCH AND MECHATRONICS ENGINEERING, 2015, 121 : 1491 - 1497
- [7] Construction and analysis of the dalian driving cycle International Journal of Control and Automation, 2015, 8 (06): : 363 - 368
- [8] Research on Construction Method of Vehicle Driving Cycle in Urban Congested Road Section under Bad Weather CICTP 2022: INTELLIGENT, GREEN, AND CONNECTED TRANSPORTATION, 2022, : 3109 - 3120
- [9] Driving Cycle Construction and Operation Characteristics of Taxi in Xi'an City CICTP 2020: TRANSPORTATION EVOLUTION IMPACTING FUTURE MOBILITY, 2020, : 2622 - 2634
- [10] Research on Driving Cycle Construction Based on Sorting-Time Hybrid Method 2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 2884 - 2887