Instability analysis and reinforcement technologies for open excavation section of high speed railway tunnel

被引:0
|
作者
Changmao, Xu [1 ]
Li, Wu [1 ]
Shuanglan, Wu [1 ]
Bo, Li [1 ]
机构
[1] Faculty of Engineering, China University of Geosciences(Wuhan), China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:2241 / 2256
相关论文
共 50 条
  • [1] Instability analysis and reinforcement technologies for open excavation section of high speed railway tunnel
    Li, Wu (lwu@cug.edu.cn), 1600, E-Journal of Geotechnical Engineering (19):
  • [2] Assessment and control analysis of impact of open cut foundation pit excavation on adjacent high speed railway shield tunnel
    Zhang, Qi-Fang
    Zhong, Zhou
    Wan, Zhao-Hong
    Hao, Yang
    Wang, Xiang-Can
    Electronic Journal of Geotechnical Engineering, 2015, 20 (14): : 6131 - 6141
  • [3] Effects of twin tunnel undercrossing excavation on the operational high speed railway tunnel with ballastless track
    Fu, Jinyang
    Zhao, Ningning
    Qu, Yong
    Yang, Junsheng
    Wang, Shuying
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 124
  • [4] STUDY OF EXCAVATION METHODS OF HIGH-SPEED RAILWAY TUNNEL IN THE WEAK SURROUNDING ROCK
    Zhu, Haobo
    Sun, Feng
    Zhang, Dingli
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 873 - 876
  • [5] Instability Mechanism of Surrounding Rock for Super-Large Cross Section at High-speed Railway Tunnel Portal
    Wu Shuanglan
    Yang Shihao
    Zhang Xuewen
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1597 - 1603
  • [6] A fundamental study on dynamic response of tunnel reinforcement structure for high speed railway
    Kameda, T
    Nishioka, T
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 347 - 350
  • [7] Excavation monitoring of a large cross section tunnel underpassing an existing railway
    Sasaki, R
    Takayama, T
    Tsukada, M
    Kimura, M
    Torii, S
    Nakagaki, H
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 253 - 258
  • [8] Construction monitoring analysis for large cross-section tunnel excavation of passenger dedicated railway
    Zhang, Ming-Ju
    Wang, Cheng-Hao
    Lü, Qi
    Ye, Xin-Feng
    Beijing Gongye Daxue Xuebao/Journal of Beijing University of Technology, 2010, 36 (10): : 1350 - 1356
  • [9] Research on the Key Technologies of Construction of TBM Interval Tunnel across High-speed Railway Tunnel
    Zhang, Mingshu
    Gong, Lun
    Chen, Haiyong
    Sun, Xuefei
    Yu, Jingwen
    Journal of Railway Engineering Society, 2019, 36 (07): : 76 - 80
  • [10] New technologies for high-risk tunnel construction in GuiyangGuangzhou high-speed railway
    Yubao Zhao
    Shougen Chen
    Xinrong Tan
    Ma Hui
    Journal of Modern Transportation, 2013, 21 (04) : 258 - 265