The model for the temporary rest of train based on the operation adjustment of passenger dedicated line

被引:0
|
作者
Shi, Yu [1 ]
Yang, Hao [1 ]
Chen, Ziding [1 ]
机构
[1] School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China
来源
关键词
Functions - Railroad plant and structures - Railroad transportation - Joining;
D O I
暂无
中图分类号
学科分类号
摘要
The temporary rest of train should settle 5 interactive problems, which are the selection of the location for the temporary rest of train, the choice of the train for temporary rest, the arrangement of the joining train, the organization of the passengers' transfer and the EMU allocation after the temporary rest. The mathematical model for the temporary rest of train was established with the train running time (normal and temporary speed limit), the departing time of train from the station, the minimal interval time of the tracing trains, the actual delay time at the terminal station, and the type of the joining train at the departing station as the constraint conditions, and with the minimum total delay time at the terminal station as the objective function. With the method of computer simulation and according to different state of the trains, the model can be solved by iterative calculation. For testing the model, this paper provides a simulation experiment with the test data between Shanghai and Nanjing in the simulation test system of Jinghu high-speed railway. The experiment results indicate that the effect of the train operation adjustment can be remarkably promoted by applying the model for the temporary rest of train to reasonably arrange the joining train and the passengers' transfer based on modifying the initial EMU routing scheme.
引用
收藏
页码:109 / 115
相关论文
共 50 条
  • [1] The Passenger Train Plan Based on Passenger Dedicated Line
    Wang, Sheng-nan
    4TH INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT (ICEM), 2017, : 375 - 379
  • [2] Study on the Train Operation Optimization of Passenger Dedicated Lines Based on Satisfaction
    Huang, Zhipeng
    Niu, Huimin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2012, 2012
  • [3] Train station classification for passenger dedicated line
    Hai, Xiaowei
    Zhao, Chanchan
    Jiang, Xiaohua
    International Journal of Advancements in Computing Technology, 2012, 4 (15) : 328 - 335
  • [4] Multiobjective Decision Model of Train Plan for Passenger-dedicated Line
    Liu Ming-jun
    Mao Bao-hua
    Gao Feng
    Be Yu-qiang
    Shao Jun-jie
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1033 - 1037
  • [5] Research on the model and algorithm of the train working diagram of dedicated passenger line
    Xu, Hong
    Ma, Jian-Jun
    Long, Jian-Cheng
    Tiedao Xuebao/Journal of the China Railway Society, 2007, 29 (02): : 1 - 7
  • [6] Study on the Line Capacity on Passenger Dedicated Lines Based on the Stops Adjustment
    Li, Xiaojuan
    Han, Baoming
    Li, Dewei
    Li, Hua
    SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 1158 - 1162
  • [7] Optimization Method of Passenger Train Plan based on Stop Schedule Plan for Passenger Dedicated Line
    Qi, Xin
    Xiong, Jian
    2012 2ND INTERNATIONAL CONFERENCE ON UNCERTAINTY REASONING AND KNOWLEDGE ENGINEERING (URKE), 2012, : 204 - 207
  • [8] Interaction analysis between night train operation and maintenance time on passenger dedicated railway line
    Nie, Lei
    Hu, Bisong
    Fu, Huiling
    Tong, Lu
    Journal of Transportation Systems Engineering and Information Technology, 2010, 10 (05) : 66 - 72
  • [9] MPSO-Based Model of Train Operation Adjustment
    Zhang, Lanxia
    Qin, Yong
    Meng, Xuelei
    Wang, Li
    Zhu, Tao
    GREEN INTELLIGENT TRANSPORTATION SYSTEM AND SAFETY, 2016, 138 : 114 - 123
  • [10] Train Operation Adjustment Model Based on Intelligent Application
    Li, Zhi
    Duan, Jiaying
    Zeng, Yi
    Ren, Yumou
    Zhang, Qi
    Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (02): : 173 - 182