Study of construction method of tunnel in shallow broken rock mass

被引:0
|
作者
Qiao, Chun-Jiang [1 ,2 ]
Chen, Wei-Zhong [1 ,3 ]
Wang, Hui [1 ]
Tian, Hong-Ming [1 ]
Tan, Xian-Jun [1 ]
机构
[1] Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
[2] Second Highway Consultants Co. Ltd. of China Communications Construction Corporation, Wuhan 430056, China
[3] Geotechnical and Structural Engineering Research Center, Shandong University, Jinan 250061, China
来源
Yantu Lixue/Rock and Soil Mechanics | 2011年 / 32卷 / SUPPL.2期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
12
引用
收藏
页码:455 / 462
相关论文
共 50 条
  • [1] Study of construction method of tunnel in shallow broken rock mass
    Qiao Chun-jiang
    Chen Wei-zhong
    Wang Hui
    Tian Hong-ming
    Tan Xian-jun
    ROCK AND SOIL MECHANICS, 2011, 32 : 455 - +
  • [2] Rock mass pressure calculation method of shallow muddy tunnel
    Hui, Ma
    Electronic Journal of Geotechnical Engineering, 2015, 20 (10): : 4349 - 4362
  • [3] Study of a rock mass by seismoacoustic methods in surveys for tunnel construction
    Aleshin, A. S.
    Antsiferov, A. V.
    Kompanets, A. I.
    Tirkel, M. G.
    IZVESTIYA-PHYSICS OF THE SOLID EARTH, 2006, 42 (01) : 79 - 86
  • [4] Study of a rock mass by seismoacoustic methods in surveys for tunnel construction
    A. V. Antsiferov
    A. I. Kompanets
    M. G. Tirkel
    Izvestiya, Physics of the Solid Earth, 2006, 42 : 79 - 86
  • [5] Design method of grouting parameters for broken rock tunnel
    Li, Lixin
    Zou, Jinfeng
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2013, 44 (08): : 3432 - 3440
  • [6] Study on dynamic classification of rock mass of mountain tunnel during construction
    Ma, Chao-Feng
    Jie, Yu-Xin
    Wang, Du-Li
    Li, Xiao
    Liang, Chang-Yu
    Tiedao Xuebao/Journal of the China Railway Society, 2013, 35 (10): : 106 - 113
  • [7] Design of Shallow Depth Tunnel with Asymmetric Twin Arches and its Construction Procedure in Poor Rock Mass
    Zhou Xiaojun
    Wang Xiaofeng
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1321 - +
  • [8] Mechanical characteristics of ultra-shallow buried high-speed railway tunnel in broken surrounding rock during construction
    Hao, Shaoju
    Fei, Ruizhen
    Yu, Jia
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (03) : 645 - 659
  • [9] Experiment Study on Tunnel Crown Collapse and the Bolt Anchoring Effect in Weak and Broken Rock Mass
    Xu, Q. W.
    Wang, W. T.
    Cheng, P. P.
    Zhu, H. H.
    Ding, W. Q.
    TRANSPORTATION RESEARCH CONGRESS 2016: INNOVATIONS IN TRANSPORTATION RESEARCH INFRASTRUCTURE: PROCEEDINGS OF THE TRANSPORTATION RESEARCH CONGRESS 2016, 2018, : 430 - 437
  • [10] Conducting Rock Mass Rating for tunnel construction on Mars
    Beemer, Heidi D.
    Worrells, D. Scott
    ACTA ASTRONAUTICA, 2017, 139 : 176 - 180