Integration Technology of BIM and 3DGIS and Its Application in Railway Bridge Construction

被引:2
|
作者
Zhang W. [1 ,2 ]
Wu Q. [3 ]
Qi P. [4 ]
Wu Z. [1 ,3 ]
Wang B. [5 ]
机构
[1] School of Traffic and Transportation, Shijiazhuang Tiedao University, Shijiazhuang, 050043, Hebei
[2] Hebei Key Laboratory of Traffic Safety and Control, Shijiazhuang Tiedao University, Shijiazhuang, 050043, Hebei
[3] China State Railway Group Co., Ltd., Beijing
[4] Technical Research Department, China Railway Fifth Survey and Design Institute Group Co., Ltd., Beijing
[5] Chief Engineer Office, Shijiazhuang Traffic Survey and Design Institute, Shijiazhuang, 050071, Hebei
来源
关键词
3DGIS; Building information model; Construction management; Model transformation and integration; Railway bridge;
D O I
10.3969/j.issn.1001-4632.2019.06.06
中图分类号
学科分类号
摘要
The integration technology of BIM and 3DGIS is proposed. The first step of this technology is to convert the BIM generated by Revit software into a fast lossless format for 3DGIS. The geometric information of BIM is transformed into a *.dae format file acceptable to 3DGIS and the attribute information of BIM is saved to the database. The *.dae format file is associated with the database by using the ID of the element as the unique field. The second step is to integrate BIM with 3DGIS, including the unification of coordinate system, the information reading and transformation of attitude, azimuth and scale factors, the traversal reading and saving of model transformation files, the comprehensive integration of BIM information and spatial expression in 3DGIS. By using C# programming language and SQL Server database, the railway bridge construction management information system based on the integration of BIM and 3DGIS is developed and applied in the construction project of a super large bridge of Menghua Railway. Results show that the system integrates a large number of BIM models of railway bridges such as 215 piers, 212 beams and 2 continuous beams into 3DGIS in batches. The problem of data sharing and data mining between different stages of design, construction and management is solved. The functions of 3DGIS visualization, roaming and 3D spatial analysis, BIM construction management, the dynamic simulation of construction and the overview of construction progress are realized. © 2019, Editorial Department of China Railway Science. All right reserved.
引用
收藏
页码:45 / 51
页数:6
相关论文
共 21 条
  • [1] Froese T.M., Fischer M.A., Ritzenthaler J., Et al., Industry Foundation Classes for Project Management-a Trial Implementation, Electronic Journal of Information Technology in Construction, 4, pp. 17-36, (1999)
  • [2] Song Y., Wang X., Tan Y., Et al., Trends and Opportunities of BIM-GIS Integration in the Architecture, Engineering and Construction Industry: a Review from a Spatio-Temporal Statistical Perspective, International Journal of Geo-Information, 6, 12, pp. 397-428, (2017)
  • [3] Karan E.P., Irizarry J., Haymaker J., BIM and GIS Integration and Interoperability Based on Semantic Web Technology, Journal of Computing in Civil Engineering, 30, 3, (2016)
  • [4] Ospina-Alvarado A.M.C.D., Interaction of Processes and Phases in Project Scheduling Using BIM for AECFM Integration, Construction Research Congress, pp. 939-947, (2010)
  • [5] Donkers S., Automatic Generation of CityGML LOD3 Building Models from IFC Models, (2013)
  • [6] De Laat R., Van Berlo L., Integration of BIM and GIS: the Development of the CityGML GeoBIM Extension, pp. 211-255, (2011)
  • [7] Wu B., Zhang S., Integration of GIS and BIM for Indoor Geovisual Analytics, The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 41, B2, pp. 455-458, (2016)
  • [8] Liu X., Wang X., Wright G., Et al., A State-of-the-Art Review on the Integration of Building Information Modeling (BIM) and Geographic Information System (GIS), ISPRS International Journal of Geo-Information, 6, 2, (2017)
  • [9] Zhu J., Wright G., Wang J., Et al., A Critical Review of the Integration of Geographic Information System and Building Information Modelling at the Data Level, International Journal of Geo-Information, 7, 2, pp. 66-82, (2018)
  • [10] Zhao X., Tang S., Liu M., Et al., Semantics-Constrained Conversion Approach of RVT Model to CityGML Model, Geomatics World, 22, 2, pp. 15-20, (2015)