Park Energy Demand Forecasting Based on CSO Optimized Deep Belief Network

被引:0
|
作者
Wu W. [1 ]
Wu J. [2 ]
Lei Z. [2 ]
Zheng M. [1 ]
Zhang Y. [1 ]
Li M. [1 ]
Huang X. [1 ]
Li Y. [1 ]
机构
[1] Grid Planning & Research Center, Guangdong Power Grid Corporation, Guangzhou
[2] School of Automation, Guangdong University of Technology, Guangzhou
来源
关键词
Crisscross optimization; Energy demand forecast of the park; Improved grey correlation analysis; Integrated energy system; Similar day analysis;
D O I
10.13335/j.1000-3673.pst.2020.1532
中图分类号
学科分类号
摘要
Aiming at the problems of various influencing factors, complex construction model and insufficient prediction accuracy in energy demand forecasting, a energy demand forecasting method for the multi-energy complementary system is proposed, in which the improved correlation analysis and the crisscross optimization algorithm is used to optimize deep belief network. Firstly, the influencing factors of the energy demand of the park's multi-energy complementary system are analyzed, which are then determined with the mutual information and the minimum error methods. Secondly, as for the deficiency of the traditional grey correlation analysis, the the similar day selection method based on the comprehensive similarity of the distance similarity and trend similarity is established. Finally, limited by the randomness of the deep belief initial weight of the network, the crisscross optimization algorithm is used to optimize the deep belief network to forecast the cooling and heating loads of the park. ?Taking an actual park as an example, this paper analyzes the influence of cooling, heating and power load changes on the energy demand forecasting, and verifies that the proposed forecasting method can effectively improve the prediction accuracy and has high accuracy and practicability. © 2021, Power System Technology Press. All right reserved.
引用
收藏
页码:3859 / 3868
页数:9
相关论文
共 25 条
  • [1] SHENG Wanxing, WU Ming, JI Yu, Et al., Key techniques and engineering practice of distributed renewable generation clusters integration, Proceedings of the CSEE, 39, 8, pp. 2175-2186, (2019)
  • [2] WANG Yijun, DU Wenjuan, CHEN Chen, Et al., Study on sub-synchronous oscillations of power systems caused by grid-connected wind farms based on the improved complex torque coefficients method, Transactions of China Electrotechnical Society, 35, 15, pp. 3258-3269, (2020)
  • [3] FU Bingbin, WAN Xiaohua, XIONG Xiaofu, Et al., Risk assessment of wind power integrated system based on time-periodic characteristics of wind speed, Power System Protection and Control, 46, 19, pp. 43-50, (2018)
  • [4] LIU Yuhan, WANG Feng, TAN Yanghong, Multi-objective optimal capacity configuration and emission reduction benefit analysis of grid-connected microgrid, Proceedings of the CSU-EPSA, 29, 9, pp. 70-75, (2017)
  • [5] GU Jie, BAI Kaifeng, SHI Yajun, Optimized operation of regional integrated energy system based on multi-agent master-slave game optimization interaction mechanism, Power System Technology, 43, 9, pp. 3119-3129, (2019)
  • [6] TIAN Liting, CHENG Lin, GUO Jianbo, Et al., Multi-energy system valuation method based on emergy analysis, Power System Technology, 43, 8, pp. 2925-2933, (2019)
  • [7] XIONG Wen, LIU Yuquan, SU Wanhuang, Et al., Optimal configuration of multi-energy storage in regional integrated energy system considering multi-energy complementation, Electric Power Automation Equipment, 39, 1, pp. 118-126, (2019)
  • [8] CHEN Houhe, WANG Yang, ZHANG Rufeng, Et al., Spinning reserve capacity optimization considering coordination between source and load for power system with wind power, Electric Power Automation Equipment, 37, 8, pp. 185-192, (2017)
  • [9] CUI J, YU R Z, ZHAO D B, Et al., Intelligent load pattern modeling and denoising using improved variational mode decomposition for various calendar periods, Applied Energy, 247, pp. 480-491, (2019)
  • [10] SINGH P, DWIVEDI P., A novel hybrid model based on neural network and multi-objective optimization for effective load forecast, Energy, 182, pp. 606-622, (2019)