Optimization of drawing sequence in longwall top coal caving mining through an FDM-DEM model

被引:0
|
作者
Huo, Yuming [1 ,2 ,3 ]
Wang, Shaozhuo [4 ]
Zhu, Defu [5 ]
Wang, Zhonglun [5 ]
机构
[1] School of Mining Engineering, Taiyuan University of Technology, Taiyuan, China
[2] Key Laboratory of Deep Coal Resource Mining of Ministry of Education, China University of Mining and Technology, Xuzhou, China
[3] Anhui Province Wanbei Coal-Electricity Group Co., Ltd., Suzhou, China
[4] Wangjiashan Coal Mine Branch, Gansu Jingmei Energy Co., Ltd., Baiyin, China
[5] Key Laboratory of In-situ Property-improving Mining of Ministry of Education, Taiyuan University of Technology, Taiyuan, China
来源
Energy Science and Engineering | 2024年 / 12卷 / 11期
关键词
Coal mines;
D O I
10.1002/ese3.1944
中图分类号
学科分类号
摘要
The Longwall top coal caving (LTCC) technology is regarded as one of the most crucial approaches for exploiting thick coal seams. A crucial and effective approach for improving the recovery rate of top coal and reducing coal resource losses in LTCC faces is to reasonably select process parameters based on actual mining and geological conditions of different mines. The main focus of this paper is the engineering background of the 12,309 LTCC face in Wangjialing Coal Mine. A numerical model is developed using FALC3D and PFC3D software, employing a finite difference method and discrete element method. This model takes into account predetermined cutting and caving ratios, as well as drawing intervals. To examine the caving process and roof particles, three different drawing sequences were examined: sequential drawing, segmented sequential drawing, and intermittent drawing. The findings suggest that, in terms of the reset shape of the drawing body before individual and entire caving, the segmented sequential drawing method exhibits noticeable drawbacks compared to the other two methods. From the perspective of the drawing weight, following closing drawing opening when seeing gangue, the sequential drawing, segmented sequential drawing, and intermittent drawing methods can yield 32.42 t, 26.87 t, and 35.78 t of top coal, with corresponding recovery rates of 73.39%, 60.81%, and 82.97%. Therefore, it can be concluded that intermittent drawing is suitable for implementation on LTCC working face 12,309. © 2024 The Author(s). Energy Science & Engineering published by Society of Chemical Industry and John Wiley & Sons Ltd.
引用
收藏
页码:5200 / 5210
相关论文
共 50 条
  • [1] DEM study of the drawing law in longwall top-coal caving mining
    Fu, Q
    Wu, J
    [J]. COMPUTER APPLICATIONS IN THE MINERALS INDUSTRIES, 2001, : 283 - 286
  • [2] Optimization of Caving Technology in an Extrathick Seam with Longwall Top Coal Caving Mining
    Yang, Liu
    Li, Lianghui
    Wei, Weijie
    [J]. ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2021, 2021
  • [3] Optimization of Caving Technology in an Extrathick Seam with Longwall Top Coal Caving Mining
    Yang, Liu
    Li, Lianghui
    Wei, Weijie
    [J]. Advances in Materials Science and Engineering, 2021, 2021
  • [4] Drawing mechanism of fractured top coal in longwall top coal caving
    Song, Zhengyang
    Konietzky, Heinz
    Herbst, Martin
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2020, 130
  • [5] BBR study of top-coal drawing law in longwall top-coal caving mining
    Wang, Jia-Chen
    Zhang, Jin-Wang
    [J]. Meitan Xuebao/Journal of the China Coal Society, 2015, 40 (03): : 487 - 493
  • [6] Improving the top coal recovery ratio in longwall top coal caving mining using drawing balance analysis
    Yang, Liu
    Wang, Jiachen
    Yang, Shengli
    Li, Lianghui
    Wu, Shanxi
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (05) : 319 - 337
  • [7] Effect of upward angle on the drawing mechanism in longwall top-coal caving mining
    Yang, Shengli
    Zhang, Jinwang
    Chen, Yi
    Song, Zhengyang
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2016, 85 : 92 - 101
  • [8] Theoretical description of drawing body shape in an inclined seam with longwall top coal caving mining
    Wang, Jiachen
    Wei, Weijie
    Zhang, Jinwang
    [J]. INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2020, 7 (01) : 182 - 195
  • [9] Numerical Investigation of Top-Coal Migration in the First Coal-Drawing Process by an FDM-DEM Coupling Method
    Huo, Yuming
    Song, Xuanmin
    Zhu, Defu
    [J]. ENERGIES, 2020, 13 (20)
  • [10] Theoretical description of drawing body shape in an inclined seam with longwall top coal caving mining
    Jiachen Wang
    Weijie Wei
    Jinwang Zhang
    [J]. International Journal of Coal Science & Technology, 2020, 7 : 182 - 195