Budget-constrained rail network electrification problem

被引:0
|
作者
Patil, Priyadarshan N. [1 ]
Walthall, Rydell [2 ]
Boyles, Stephen D. [2 ]
机构
[1] Graduate Program in Operations Research and Industrial Engineering, The University of Texas, Austin, United States
[2] Department of Civil, Architectural and Environmental Engineering, The University of Texas, Austin, United States
来源
arXiv | 2021年
关键词
912.2; Management;
D O I
暂无
中图分类号
学科分类号
摘要
Electric utilities
引用
收藏
相关论文
共 50 条
  • [1] A budget-constrained partial protection planning of a rail intermodal terminal network
    Sarhadi, Hassan
    Chauhan, Satyaveer S.
    Verma, Manish
    SN APPLIED SCIENCES, 2021, 3 (06):
  • [2] A budget-constrained partial protection planning of a rail intermodal terminal network
    Hassan Sarhadi
    Satyaveer S. Chauhan
    Manish Verma
    SN Applied Sciences, 2021, 3
  • [3] Budget-Constrained Rail Electrification Modeling Using Symmetric Traffic Assignment: A North American Case Study
    Patil, Priyadarshan
    Walthall, Rydell
    Boyles, Stephen D.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2022, 28 (02)
  • [4] A network simplex method for the budget-constrained minimum cost flow problem
    Holzhauser, Michael
    Krumke, Sven O.
    Thielen, Clemens
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 259 (03) : 864 - 872
  • [5] Budget-Constrained Ego Network Extraction With Maximized Willingness
    Hsu, Bay-Yuan
    Lu, Chia-Hsun
    Chang, Ming-Yi
    Tseng, Chih-Ying
    Shen, Chih-Ya
    IEEE TRANSACTIONS ON KNOWLEDGE AND DATA ENGINEERING, 2024, 36 (12) : 7692 - 7707
  • [6] Budget-constrained search
    Manning, R
    Manning, JRA
    EUROPEAN ECONOMIC REVIEW, 1997, 41 (09) : 1817 - 1834
  • [7] An exact algorithm for the budget-constrained multiple knapsack problem
    You, Byungjun
    Yamada, Takeo
    INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS, 2011, 88 (16) : 3380 - 3393
  • [8] Robustness Analysis of Budget-Constrained Route Flow Observability Problem
    Yuan, Jian
    Li, Lin
    Ma, Wanjing
    CICTP 2021: ADVANCED TRANSPORTATION, ENHANCED CONNECTION, 2021, : 2494 - 2503
  • [9] A Reliable Budget-Constrained FL/ND Problem with Unreliable Facilities
    Shishebori, Davood
    Snyder, Lawrence V.
    Jabalameli, Mohammad Saeed
    NETWORKS & SPATIAL ECONOMICS, 2014, 14 (3-4): : 549 - 580
  • [10] A Reliable Budget-Constrained FL/ND Problem with Unreliable Facilities
    Davood Shishebori
    Lawrence V. Snyder
    Mohammad Saeed Jabalameli
    Networks and Spatial Economics, 2014, 14 : 549 - 580