Promoting employee participation in operation and maintenance of green office building by adopting the total productive maintenance (TPM) concept

被引:0
|
作者
Au-Yong, Cheong Peng [1 ]
Azmi, Nur Farhana [1 ]
Myeda, Nik Elyna [1 ]
机构
[1] Centre for Building, Construction and Tropical Architecture (BuCTA), Department of Building Surveying, Faculty of Built Environment, Universiti Malaya, Kuala Lumpur,50603, Malaysia
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Promoting employee participation in operation and maintenance of green office building by adopting the total productive maintenance (TPM) concept
    Au-Yong, Cheong Peng
    Azmi, Nur Farhana
    Myeda, Nik Elyna
    [J]. JOURNAL OF CLEANER PRODUCTION, 2022, 352
  • [2] The Adoption of Total Productive Maintenance (TPM ) Concept for Maintenance Procurement of Green Buildings in Malaysia
    Zulkifly, Umi Kalsum Zolkafli
    Zakaria, Norhanim
    Mohd-Danuri, Mohd Suhaimi
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (01): : 40 - 55
  • [3] TPM (TOTAL PRODUCTIVE MAINTENANCE)
    DAPERE, R
    [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1989, 86 (11): : 931 - 940
  • [4] Occupant awareness towards the application of total productive maintenance in green office building
    Au-Yong, Cheong Peng
    Myeda, Nik Elyna
    Azmi, Nur Farhana
    [J]. JOURNAL OF ENGINEERING RESEARCH, 2022, 10 (2A): : 292 - 304
  • [5] TOTAL PRODUCTIVE MAINTENANCE - TPM THAT WORKS
    MAGGARD, BN
    BAILEY, CL
    MOSS, D
    [J]. SEVENTH IEEE/CHMT INTERNATIONAL ELECTRONIC MANUFACTURING TECHNOLOGY SYMPOSIUM: INTEGRATION OF THE MANUFACTURING FLOW - FROM RAW MATERIAL THROUGH SYSTEMS-LEVEL ASSEMBLY, 1989, : 13 - 17
  • [6] Implementing the office total productive maintenance (''office TPM'') program: a library case study
    Patra, Nihar Kanta
    Tripathy, Jayanta Kumar
    Choudhary, B. K.
    [J]. LIBRARY REVIEW, 2005, 54 (07) : 415 - +
  • [7] Total productive maintenance (TPM) - Part 2
    Anon
    [J]. Foundryman, 2002, 95 (03):
  • [8] Total Productive Maintenance (TPM) - Part 7
    Carannante, Toni
    [J]. Foundryman, 2002, 95 (10): : 356 - 357
  • [9] Total productive maintenance (TPM) - Part 3
    Carannante, Toni
    [J]. Foundryman, 2002, 95 (05): : 185 - 196
  • [10] Total productive maintenance (TPM) - Part 5
    Carannante, Toni
    [J]. Foundryman, 2002, 95 (08):