Challenges of slope design for high cut slopes in jointed rock masses

被引:0
|
作者
Dinis, João Carlos Carvalho [1 ]
Lenz, Gerold [1 ]
Pöschl, Irmina [1 ]
Priewasser, Robert [1 ]
机构
[1] iC consulenten ZT GmbH, Zollhausweg 1, Bergheim,5101, Austria
来源
Geomechanik und Tunnelbau | 2024年 / 17卷 / 05期
关键词
D O I
10.1002/geot.202400056
中图分类号
学科分类号
摘要
The construction of the 275 m high Yusufeli arch dam and auxiliary structures required the execution of very steep cut slopes with more than 400 m height. Uncertainties regarding the geotechnical conditions imposed a serious challenge for the cut slope design. The design approach evolved from initial back-calculations to a robust methodology, which was constantly revised and updated as excavation proceeded. The article explains the modular design procedure that allowed continuous interaction, adjustments and updates of and between different design and construction activities. It briefly describes the process of geological data collection and parameter determination and elaborates on the calculation tools utilised for the design. Finally, the verification and updating of the design during construction is explained on a selected case study. The excavation of the Yusufeli Dam was completed in 2018, dam concreting and grouting in 2022, and the final impounding level was reached by the end of 2023. © 2024 Ernst & Sohn GmbH.
引用
收藏
页码:420 / 425
相关论文
共 50 条
  • [1] Wedge Failure Analysis of Slopes in Highly Jointed Rock Masses in the Zones of High Seismicity
    Mantrala, Srinivas
    Kumar, Hemant
    Verma, A. K.
    Sitharam, T. G.
    INDIAN GEOTECHNICAL JOURNAL, 2022, 52 (03) : 626 - 649
  • [2] Wedge Failure Analysis of Slopes in Highly Jointed Rock Masses in the Zones of High Seismicity
    Srinivas Mantrala
    Hemant Kumar
    A. K. Verma
    T. G. Sitharam
    Indian Geotechnical Journal, 2022, 52 : 626 - 649
  • [3] Modeling jointed rock masses and prediction of slope stabilities by DEM
    Esaki, T
    Jiang, Y
    Bhattarai, TN
    Maeda, T
    Nozaki, A
    Mizokami, T
    ROCK MECHANICS FOR INDUSTRY, VOLS 1 AND 2, 1999, : 83 - 90
  • [4] Wave propagations through jointed rock masses and their effects on the stability of slopes
    Che, Ailan
    Yang, Hongkai
    Wang, Bin
    Ge, Xiurun
    ENGINEERING GEOLOGY, 2016, 201 : 45 - 56
  • [5] Stability Analyses of Western Slopes in Jointed Rock Masses for GuangYang Highway
    Wang, Shuli
    Mu, ManGen
    Wang, Ran
    Cui, Wenbo
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 234 - +
  • [7] Fuzzy system method for the design of a jointed rock slope
    Li, WX
    Mei, SH
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2004, 41 (03) : 467 - 467
  • [8] Fuzzy system method for the design of a jointed rock slope
    Li, W.X.
    Mei, S.H.
    International Journal of Rock Mechanics and Mining Sciences, 2004, 41 (SUPPL. 1) : 1 - 6
  • [9] High lateral strain ratio in jointed rock masses
    Singh, Mahendra
    Singh, Bhawani
    ENGINEERING GEOLOGY, 2008, 98 (3-4) : 75 - 85