Disturbance mechanism analysis of pipe jacking crossing existing subway tunnel based on BPNN parameter inversion

被引:0
|
作者
Tao, Shuai [1 ,2 ]
Zhang, Jun-Bo [1 ,2 ]
Han, Xi-Bing [1 ,2 ]
Yu, Jian-Qiang [1 ,2 ]
Xi, Ling-Zhi [1 ,2 ]
Li, Shu-Yi [1 ,2 ]
机构
[1] POWERCHINA Huadong Engineering Corporation Limited, Zhejiang, Hangzhou,311122, China
[2] Zhejiang Huadong Engineering Consulting Corporation Limited, Zhejiang, Hangzhou,311122, China
关键词
Compendex;
D O I
3rd International Conference on Applied Mathematics, Modelling, and Intelligent Computing, CAMMIC 2023
中图分类号
学科分类号
摘要
Numerical methods
引用
收藏
相关论文
共 22 条
  • [1] Prediction analysis of vertical displacement of pipe jacking crossing existing subway tunnel based on LSTM algorithm
    Tao, Shuai
    Zhang, Jun-Bo
    Han, Xi-Bing
    Yu, Jian-Qiang
    Xi, Ling-Zhi
    Li, Shu-Yi
    Proceedings of SPIE - The International Society for Optical Engineering, 2023, 12756
  • [2] Mechanism Analysis of Settlement and Deformation of Subgrade of Existing Expressway Through Pipe Jacking
    Yingran, Liu
    Fei, Wang
    Yu, Sun
    Xiaoqiang, Wei
    Junqiang, Ling
    Jian, Gong
    Ximing, Qin
    SSRN,
  • [3] Vibration analysis of the impact of the blasting construction of a power tunnel crossing underneath an existing subway station
    Gu, Zhimin
    Sun, Bingfeng
    Cui, Xiaoqing
    Guo, Hong
    World of Mining - Surface and Underground, 2020, 72 (02): : 86 - 92
  • [4] Numerical Analysis of Disturbance Control in a Four-Hole Parallel Tunnel Crossing Beneath Existing Tunnels
    Huang, Wei
    Liu, Wen
    Ou, Min-Tao
    Zhao, Lu
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2025, 43 (02)
  • [5] Upper Limit Analysis of Tunnel Collapse Under Existing Pipe Gallery Based on Hoek-Brown Strength Parameter
    Liu P.
    Wang H.
    Liu Q.
    Xu C.
    Liu C.
    Yin X.
    Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2023, 31 (05): : 1205 - 1218
  • [6] Parameter Sensitivity and Inversion Analysis for a Concrete Face Rockfill Dam Based on CS-BPNN
    Chen, Yue
    Gu, Chongshi
    Shao, Chenfei
    Qin, Xiangnan
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [7] REINFORCEMENT MECHANISM AND MECHANICAL ANALYSIS FOR PIPE ROOF SUPPORT USED IN SUBWAY STATION WITH SHALLOW TUNNEL CONSTRUCTION METHOD
    Zhao, Yanfa
    Zhou, Peng
    Xie, Gaohong
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 842 - 847
  • [8] Reinforcement mechanism and mechanical analysis for pipe roof support used in subway station with shallow tunnel construction method
    Guo, Yan-Jing
    Fang, Qian
    Li, Bing
    Beijing Gongye Daxue Xuebao / Journal of Beijing University of Technology, 2010, 36 (01): : 40 - 45
  • [9] Fault Diagnosis and Maintenance Countermeasures of Transverse Drainage Pipe in Subway Tunnel Based on Fault Tree Analysis
    Liu, Shiyang
    Zhang, Xuefu
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (23)
  • [10] Parameter sensitivity and inversion analysis of a concrete faced rock-fill dam based on HS-BPNN algorithm
    Sun PengMing
    Bao TengFei
    Gu ChongShi
    Jiang Ming
    Wang Tian
    Shi ZhongWen
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2016, 59 (09) : 1442 - 1451