Application of autocad in auxiliary design of highway bridge pile foundation

被引:0
|
作者
Fan X. [1 ]
Huang Q. [1 ]
机构
[1] CCCC Fourth Highway Engineering Co., Ltd., Inner Mongolia, Hohhot
来源
关键词
AutoCAD; Highway bridge pile foundation; Pile foundation calculation; Two-dimensional automatic drawing;
D O I
10.14733/cadaps.2022.S4.1-11
中图分类号
学科分类号
摘要
With the rapid development of computer hardware and software technology, CAD technology is widely used in the field of engineering technology, and various design software in different fields are constantly being introduced. Based on the analysis of the pile foundation design steps and key calculations in the design, this paper adopts the method of parametric design and drawing. The calculation results show that the foundation pile will not buckle under the vertical design load of the pile top, and the stability of the bridge foundation pile meets the design requirements. Subsequent inspection results showed that all indicators of the bridge pile foundation and superstructure met the requirements, and the bridge was operating well and no safety hazards were seen. The analysis of the influencing factors of the engineering example shows that there is a critical pier height for the pile-column bridge foundation pile in the steep slope section, which is related to the depth of the foundation pile; The depth ratio should not exceed 0.5. With the increase of the elastic modulus E of the pile, the critical buckling load of the foundation pile gradually increases, while the length of the calculated stability pile gradually decreases. With the increase of the pile diameter, the critical pier height value of the pile gradually decreases, and the ratio of the height of the pier to the depth of the foundation pile decreases with the increase of the pile diameter. When designing the foundation pile of a type bridge, a reasonable and effective selection of the diameter of the foundation pile plays an important role in improving its buckling stability. © 2022 CAD Solutions, LLC,.
引用
收藏
页码:1 / 11
页数:10
相关论文
共 50 条
  • [1] Simplified calculation method of highway bridge pile foundation settlement
    Fu, Decheng
    Wang, Lei
    INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, VOLS 1 & 2, 2014, : 1323 - 1328
  • [2] A Application of settlement based design methodology for pile-foundation in bump at the end of a bridge
    Tongji University, Shanghai 200092, China
    Tumu Gongcheng Xuebao, 2006, 1 (83-86):
  • [3] DEEP FOUNDATION DESIGN IN THE NEW ONTARIO HIGHWAY BRIDGE DESIGN CODE
    FELLENIUS, BH
    MEYERHOF, GG
    CANADIAN GEOTECHNICAL JOURNAL, 1983, 20 (01) : 173 - 176
  • [4] Experimental and Application Study on Underpinning Engineering of Bridge Pile Foundation
    Yan, Lei
    Wang, Gang
    Chen, Min
    Yue, Kefeng
    Li, Qingning
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [5] Optimal Design of Pile Foundation in Fully Integral Abutment Bridge
    Xue, Jun Qing
    Briseghella, Bruno
    Chen, Bao Chun
    Zhang, Pei Quan
    Zordan, Tobia
    DEVELOPMENTS IN INTERNATIONAL BRIDGE ENGINEERING, 2016, 9 : 3 - 15
  • [6] A study on the design of highway bridge pile foundations in volcanic ash ground
    Tomisawa, K.
    Egawa, T.
    Miura, S.
    ADVANCES IN TRANSPORTATION GEOTECHNICS II, 2012, : 635 - 642
  • [7] Application of extended end composite pile design in pile foundation work
    Kim, Seungho
    Whang, Seoung-Wook
    Kim, Sangyong
    Hyung, Won Gil
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2017, 170 (05) : 455 - 465
  • [8] DEEP FOUNDATION DESIGN IN THE NEW ONTARIO HIGHWAY BRIDGE DESIGN CODE - REPLY
    FELLENIUS, BH
    MEYERHOF, GG
    CANADIAN GEOTECHNICAL JOURNAL, 1984, 21 (03) : 599 - 600
  • [9] DEEP FOUNDATION DESIGN IN THE NEW ONTARIO HIGHWAY BRIDGE DESIGN CODE - DISCUSSION
    BAKHT, B
    JAEGER, LG
    DORTON, RA
    CANADIAN GEOTECHNICAL JOURNAL, 1983, 20 (04) : 858 - 859
  • [10] Application of triple-bridge cone penetration test in pile foundation
    Li, Zhizhong
    Li, Zhaoyuan
    Yang, Ran
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2015, 34 (04): : 856 - 864