Fast Optimization of the Net Present Value of Unconventional Wells Using Rapid Rate - Transient Analysis

被引:0
|
作者
Maraggi, Leopoldo Matias Ruiz [1 ]
Walsh, Mark P. [2 ]
Lake, Larry W. [2 ]
Male, Frank R. [3 ]
机构
[1] Univ Texas Austin, Bur Econ Geol, Austin, TX 78712 USA
[2] Univ Texas Austin, Hildebrand Dept Petr & Geosyst Engn, Austin, TX USA
[3] Penn State Univ, University Pk, PA USA
来源
SPE JOURNAL | 2024年 / 29卷 / 11期
关键词
Gasoline - Oil shale - Oil wells;
D O I
10.2118/223593-PA
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Decline- curve analysis (DCA) is the industry standard to predict hydrocarbon production to then estimate the net present value (NPV) of unconventional wells. Conventional DCA assumes the flowing bottomhole pressure (BHP) is constant. This is an unrealistic assumption for many unconventional wells that can lead to incorrect estimates of ultimate recovery and thus erroneous NPV calculations. This work illustrates the application of a novel technique that combines variable BHP conditions with decline- curve models [Rapid rate- transient analysis (RTA)] to estimate the NPV and select the optimal cluster spacing and number of fractures for a given well. We compare the results of DCA and Rapid RTA to estimate and optimize the cluster spacing for a tight oil and shale gas well. The Rapid RTA results show marked differences in terms of the shape and the optimal value of the NPV function from the simpler DCA method. For the two cases illustrated, DCA results are a direct consequence of the rate- time analysis failing to correctly detect the onset of boundary- dominated flow (BDF). In contrast, Rapid RTA correctly detects the onset of BDF and presents a defined maximum value of the NPV vs. cluster spacing (number of fractures) function. This optimal value is a trade- off between the fracture treatment cost, the speed of recovery of hydrocarbons, and the value of money with time (discount rate). The major contribution of this work is the implementation of the Rapid RTA technique allowing fast computation of pressure- ratetime analysis and NPV calculations with computational times comparable with DCA for optimizing fracture cluster spacing and the total number of fractures of unconventional wells. We have developed a web- based application to give readers a hands- on experience of this new technique and to analyze and optimize the NPV of unconventional wells.
引用
收藏
页码:6500 / 6515
页数:16
相关论文
共 50 条
  • [41] A FUZZY INFERENCE SYSTEM FOR NET PRESENT VALUE ANALYSIS OF CONSTRUCTION PROJECTS
    Ustundag, Alp
    Cevikcan, Emre
    UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 83 - 87
  • [42] Adapting inventory models for handling various payment structures using net present value equivalence analysis
    Beullens, Patrick
    Janssens, Gerrit K.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 157 : 190 - 200
  • [43] Capital- and resource-constrained project scheduling with net present value optimization
    Leyman, Pieter
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 256 (03) : 757 - 776
  • [44] Payment models and net present value optimization for resource-constrained project scheduling
    Leyman, Pieter
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 91 : 139 - 153
  • [45] Impact of Complex Fracture Networks on Rate Transient Behavior of Wells in Unconventional Reservoirs Based on Embedded Discrete Fracture Model
    Qin, Jiazheng
    Xu, Yingjie
    Tang, Yong
    Liang, Rui
    Zhong, Qianhu
    Yu, Wei
    Sepehrnoori, Kamy
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2022, 144 (08):
  • [46] A comparison of machine learning algorithms as surrogate model for net present value prediction from wells arrangement data
    Bertini Junior, Joao Roberto
    Funcia, Mei Abe
    Santos, Antonio Alberto S.
    Schiozer, Denis J.
    2019 INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS (IJCNN), 2019,
  • [47] Rate-Transient Analysis in Multifractured Horizontal Wells of Tight Oil Reservoir
    Li Haitao
    Luo Hongwen
    Zhang Jianfeng
    Wang Junchao
    SPE PRODUCTION & OPERATIONS, 2018, 33 (04): : 739 - 760
  • [48] The private net present value and private internal rate of return to becoming a nurse in Great Britain
    Morris, S
    McGuire, A
    APPLIED ECONOMICS, 2002, 34 (17) : 2189 - 2200
  • [49] Maximising the Net Present Value of Project Schedules Using CMSA and Parallel ACO
    Thiruvady, Dhananjay
    Blum, Christian
    Ernst, Andreas T.
    HYBRID METAHEURISTICS (HM 2019), 2019, 11299 : 16 - 30
  • [50] Ethanol plant investment using net present value and real options analyses
    Schmit, Todd M.
    Luo, Jianchuan
    Tauer, Loren W.
    BIOMASS & BIOENERGY, 2009, 33 (10): : 1442 - 1451