Fast Optimization of the Net Present Value of Unconventional Wells Using Rapid Rate - Transient Analysis

被引:0
|
作者
Maraggi, Leopoldo Matias Ruiz [1 ]
Walsh, Mark P. [2 ]
Lake, Larry W. [2 ]
Male, Frank R. [3 ]
机构
[1] Univ Texas Austin, Bur Econ Geol, Austin, TX 78712 USA
[2] Univ Texas Austin, Hildebrand Dept Petr & Geosyst Engn, Austin, TX USA
[3] Penn State Univ, University Pk, PA USA
来源
SPE JOURNAL | 2024年 / 29卷 / 11期
关键词
Gasoline - Oil shale - Oil wells;
D O I
10.2118/223593-PA
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Decline- curve analysis (DCA) is the industry standard to predict hydrocarbon production to then estimate the net present value (NPV) of unconventional wells. Conventional DCA assumes the flowing bottomhole pressure (BHP) is constant. This is an unrealistic assumption for many unconventional wells that can lead to incorrect estimates of ultimate recovery and thus erroneous NPV calculations. This work illustrates the application of a novel technique that combines variable BHP conditions with decline- curve models [Rapid rate- transient analysis (RTA)] to estimate the NPV and select the optimal cluster spacing and number of fractures for a given well. We compare the results of DCA and Rapid RTA to estimate and optimize the cluster spacing for a tight oil and shale gas well. The Rapid RTA results show marked differences in terms of the shape and the optimal value of the NPV function from the simpler DCA method. For the two cases illustrated, DCA results are a direct consequence of the rate- time analysis failing to correctly detect the onset of boundary- dominated flow (BDF). In contrast, Rapid RTA correctly detects the onset of BDF and presents a defined maximum value of the NPV vs. cluster spacing (number of fractures) function. This optimal value is a trade- off between the fracture treatment cost, the speed of recovery of hydrocarbons, and the value of money with time (discount rate). The major contribution of this work is the implementation of the Rapid RTA technique allowing fast computation of pressure- ratetime analysis and NPV calculations with computational times comparable with DCA for optimizing fracture cluster spacing and the total number of fractures of unconventional wells. We have developed a web- based application to give readers a hands- on experience of this new technique and to analyze and optimize the NPV of unconventional wells.
引用
收藏
页码:6500 / 6515
页数:16
相关论文
共 50 条
  • [31] Managing the Balance Between Project Value and Net Present Value Using Reinforcement Learning
    Szwarcfiter, Claudio
    Herer, Yale T.
    IEEE ACCESS, 2024, 12 : 7500 - 7518
  • [32] Using the Net Present Value Rule to Make Value-Creating Investment Decisions
    Xu Hui
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON CHEMICAL, MATERIAL AND FOOD ENGINEERING, 2015, 22 : 644 - 647
  • [33] Numerical Rate Transient Analysis Workflow Applied to Dry Gas Wells
    Carlsen, Mathias L.
    Whitson, Curtis H.
    Dahouk, Mohamad M.
    JPT, Journal of Petroleum Technology, 2024, 76 (08): : 98 - 100
  • [34] Transient pressure and rate analysis for active and interference wells in composite systems
    Chu, LF
    Grader, AS
    IN SITU, 1999, 23 (04): : 297 - 332
  • [35] Transmission assets investment timing using net present value curves
    Garcia, Reinaldo C.
    Contreras, Javier
    Correia, Pedro F.
    Munoz, Jose I.
    ENERGY POLICY, 2010, 38 (01) : 598 - 605
  • [36] Using net present value methods to evaluate quality improvement projects
    Cook, Valerie
    Ali, Ahad
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2010, 27 (03) : 333 - +
  • [37] Transient Productivity Analysis and Completion Parameter Optimization of Perforating Herringbone Wells
    Zhou, Zhijun
    Cui, Chunxue
    Zheng, Da
    Li, Kai
    Xuan, Yinglong
    Wang, Chunyao
    ACS OMEGA, 2023, 8 (20): : 17841 - 17855
  • [38] Net present value analysis comparing engineering projects by financial return
    Stoiljkovic V.
    IEEE Potentials, 2010, 29 (03): : 17 - 21
  • [39] Project options valuation with net present value and decision tree analysis
    De Reyck, Bert
    Degraeve, Zeger
    Vandenborre, Roger
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (01) : 341 - 355
  • [40] BENEFIT-COST-ANALYSIS AS A NET PRESENT VALUE-PROBLEM
    SHERRADEN, MW