Mitigating active fault rupture beneath an embankment dam

被引:0
|
作者
机构
[1] Serafini, David C.
[2] Kelson, Keith I.
[3] Mulder, Henri V.
来源
| 2018年 / Association of State Dam Safety Officials卷 / 15期
关键词
Safety engineering - Flood control - Outages - Dams - Faulting;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Active fault beneath the Tehri dam, Garhwal Himalaya - seismological evidence
    Gupta, Sandeep
    Mahesh, P.
    Sivaram, K.
    Rai, S. S.
    CURRENT SCIENCE, 2012, 103 (11): : 1343 - 1347
  • [2] Geologic hazards of an embankment dam constructed across a major, active plate boundary fault
    Al-Homoud, AS
    ENVIRONMENTAL & ENGINEERING GEOSCIENCE, 2000, 6 (04): : 353 - 382
  • [3] ANALYSIS OF DAM RESPONSE FOR FOUNDATION FAULT RUPTURE
    Mejia, Lelio
    Dawson, Ethan
    BULLETIN OF THE NEW ZEALAND SOCIETY FOR EARTHQUAKE ENGINEERING, 2009, 42 (01): : 9 - 17
  • [4] Embankment dam reconstruction
    Aleksandrov, V.P.
    Kolosov, M.A.
    Gidrotekhnicheskoe Stroitel'stvo, 1997, (07): : 20 - 22
  • [5] 'Black dam embankment'
    Plambeck, Dy
    LITERARY REVIEW, 2008, 51 (03) : 174 - 174
  • [6] Reviews on Finite Element Modeling Practices of Stone Columns for Soft Soil Stabilization Beneath an Embankment Dam
    Teshager, Daniel Kefelegn
    Belayneh, Henok Lemma
    STUDIA GEOTECHNICA ET MECHANICA, 2022, 44 (04) : 343 - 353
  • [7] HIGHWAY EMBANKMENT DOUBLES AS DAM
    SINGH, SP
    CIVIL ENGINEERING, 1979, 49 (04): : 80 - 81
  • [8] SFRC lining for an embankment dam
    Mass, Gary R.
    Concrete International, 1997, 19 (06): : 24 - 27
  • [9] THE PROBLEM OF AN EMBANKMENT DAM WITH DRAINAGE
    OESTREICH, D
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1987, 67 (07): : 293 - 300
  • [10] Mechanism of embankment dam breach
    Verma, Deepak
    Setia, Baldev
    Arora, V. K.
    RIVER FLOW 2014, 2014, : 1655 - 1659