Convergence Analysis of Stress Intensity Factor at Crack Tips for TBM Cutterheads

被引:0
|
作者
Ling J. [1 ]
Sun W. [2 ]
Yang X. [1 ]
Tong X. [1 ]
机构
[1] School of Mechanical and Automotive Engineering, Fujian University of Technology, Fuzhou
[2] School of Mechanical Engineering, Dalian University of Technology, Dalian, 116024, Liaoning
来源
| 2017年 / Chinese Mechanical Engineering Society卷 / 28期
关键词
Crack; Finite element method(FEM); Stress intensity factor; Sub-model technique; Tunnel boring machine(TBM) cutterhead;
D O I
10.3969/j.issn.1004-132X.2017.10.002
中图分类号
学科分类号
摘要
Aiming at the engineering problems such as crack damage and life prediction of TBM cutterheads, a solution method of stress intensity factors was proposed based on the sub-model technique, and it was validated by a rectangular steel plate with a crack. Then the convergence effects of crack mesh parameters on stress intensity factors at the crack tips of cutterheads were analyzed. The analysis results show that the maximum relative errors of numerical and theoretical results are as 3.6%. Besides, the crack element mesh parameters were obtained that ensured both of the accuracy and efficiency for cutterhead stress intensity factors solutions, which may provide a reference for the crack growth life prediction of structures. © 2017, China Mechanical Engineering Magazine Office. All right reserved.
引用
收藏
页码:1143 / 1148
页数:5
相关论文
共 14 条
  • [1] Hang W., Study on Damage of Hard Rock TBM Induced by Tunneling through Joint-densely-developed Hard Rock Section and Countermeasures, Tunnel Construction, 32, 4, pp. 587-593, (2012)
  • [2] Ling J., Sun W., Huo J., Et al., Study of TBM Cutterhead Fatigue Crack Propagation Life Based on Multi-degree of Freedom Coupling System Dynamics, Computers & Industrial Engineering, 83, pp. 1-14, (2015)
  • [3] Yi Z., Research on Fatigue Crack Propagation and Its Applications in Loader Beam Life, (2011)
  • [4] Xie Q., Yu H., Coupling Relationship between Loads on Cutterhead of Tunnel Boring Machine and Contact Stiffness of Gripper Shoes and Rocks, Journal of Shanghai Jiaotong University, 49, 9, pp. 1269-1275, (2015)
  • [5] Han M., Qu C., Cai Z., Et al., Dynamic Numerical Simulation of Tunneling by the TBM Cutter Head, Journal of Harbin Engineering University, 8, pp. 1098-1102, (2015)
  • [6] Xia Y., Zhu X., Lin L., Et al., Analysis of Influence Factors on Load of TBM Cutterhead, Modern Manufacturing Engineering, 9, pp. 1-6, (2015)
  • [7] Huo J., Shi Y., Teng H., Et al., Cutter Layout Design of Full-face Rock Tunnel Boring Machine (TBM), China Mechanical Engineering, 19, 15, pp. 1832-1836, (2008)
  • [8] Sun W., Ling J., Huo J., Et al., Dynamic Characteristics Study with Multidegree-of-freedom Coupling in TBM Cutterhead System Based on Complex Factors, Mathematical Problems in Engineering, 3, pp. 657-675, (2013)
  • [9] Huo J., Wu H., Yang J., Et al., Multi-directional Coupling Dynamic Characteristics Analysis of TBM Cutterhead System Based on Tunnelling Field Test, Journal of Mechanical Science & Technology, 29, 8, pp. 3043-3058, (2015)
  • [10] Huo J., Ouyang X., Wang Y., Et al., Analysis of Influencing Factors of Vibration Behaviors of TBM Cutterhead under Heavy Impact Loads, Journal of Harbin Engineering University, 4, pp. 555-559, (2015)