No-wait on-line supply chain scheduling problems with transfer time

被引:0
|
作者
Institute of Complexity Science, Qingdao University, Qingdao 266071, China [1 ]
不详 [2 ]
机构
来源
Kongzhi yu Juece Control Decis | 2008年 / 10卷 / 1092-1097+1102期
关键词
Algorithm for solving - No wait - Online scheduling - Processing time - Real time - Supply chain scheduling - Transfer time;
D O I
暂无
中图分类号
学科分类号
摘要
This paper considers on-line supply chain scheduling problems which is characterized by no-wait, transfer time between operations, processing time between two positive limits, etc. Manufacturer may receive orders from customers at any moment. There is no any information about the coming orders such as the orders quantity, release and processing time, etc. The paper gives an algorithm which can complete the orders within the time confined by available resources without changing other jobs' schedule. The simulation results show the effectiveness of the algorithm for solving large-scale order.
引用
收藏
页码:1092 / 1097
相关论文
共 50 条
  • [1] On-line No-wait Job Shop Scheduling in Supply Chain
    Chang, Gui-Juan
    Xu, Jun-Qin
    Zhang, Ji-Hui
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 176 - +
  • [2] On-Line Job Shop Scheduling with Transfer Time in Supply Chain
    Chang, Gui-Juan
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 284 - 289
  • [3] On-line supply chain scheduling problems with preemption
    Averbakh, Igor
    Xue, Zhihui
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (01) : 500 - 504
  • [4] A survey of scheduling problems with no-wait in process
    Allahverdi, Ali
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 255 (03) : 665 - 686
  • [5] On-line scheduling in Supply Chain Environment
    Proth, JM
    OPTIMAL CONTROL AND PARTIAL DIFFERENTIAL EQUATIONS: IN HONOR OF PROFESSOR ALAIN BENSOUSSAN'S 60TH BIRTHDAY, 2001, : 539 - 548
  • [6] Modeling and scheduling no-wait open shop problems
    Naderi, B.
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 158 : 256 - 266
  • [7] Online no-wait scheduling of leather workshop supply chain based on particle swarm optimization
    Huang C.
    Zhou X.
    Hou D.
    Journal Europeen des Systemes Automatises, 2018, 51 : 153 - 167
  • [8] Optimisation Of No-Wait Flowshop Scheduling Under Make-to-Order Supply Chain System
    Purnomo, Muhammad Ridwan Andi
    Purnomo, Hari
    JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2025, 28 (02): : 265 - 272
  • [9] Real time no-wait in-process scheduling flowshop problems in uncertain environment
    Bourgade, V
    MANAGEMENT AND CONTROL OF PRODUCTION AND LOGISTICS, VOL 1 AND 2, 1998, : 289 - 294
  • [10] SOME NO-WAIT SHOPS SCHEDULING PROBLEMS - COMPLEXITY ASPECT
    SRISKANDARAJAH, C
    LADET, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (03) : 424 - 438