Grid resource management and scheduling model

被引:0
|
作者
Zheng, Ran [1 ]
Li, Shengli [1 ]
Jin, Hai [1 ]
机构
[1] College of Computer Sci. and Tech., HUST, Wuhan 430074, China
来源
| 2001年 / Huazhong University of Science and Technology卷 / 29期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Resource management and scheduling in manufacturing Grid
    Liu, LL
    Yu, T
    Shi, ZB
    Fang, ML
    [J]. GRID AND COOPERATIVE COMPUTING, PT 2, 2004, 3033 : 137 - 140
  • [2] Grid resource management of HowU grid system and its grid scheduling
    [J]. Zou, D. (deqiangzhou@mail.hust.edu.cn), 2005, Huazhong University of Science and Technology (33):
  • [3] Resource management and task scheduling in grid computing
    Luo, J
    Ji, P
    Wang, XZ
    Zhu, Y
    Li, F
    Ma, T
    Wang, XP
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOL 2, 2004, : 431 - 436
  • [4] A synthesis based scheduling for Grid resource management
    Xie, Jun
    Chen, Ming
    [J]. Journal of Computational Information Systems, 2008, 4 (05): : 2381 - 2386
  • [5] Network Resource Management and Scheduling in Grid Computing
    Liu Feng
    Guo Weiwei
    Zhao Xiaomin
    [J]. 2018 INTERNATIONAL CONFERENCE ON ROBOTS & INTELLIGENT SYSTEM (ICRIS 2018), 2018, : 207 - 210
  • [6] A grid-distance based scheduling for grid resource management
    Ma, Manfu
    Wu, Jian
    Li, Shuyu
    Chen, Dingjian
    Hu, Zhengguo
    [J]. EIGHTH INTERNATIONAL CONFERENCE ON HIGH-PERFORMANCE COMPUTING IN ASIA-PACIFIC REGION, PROCEEDINGS, 2005, : 576 - 581
  • [7] Resource management and job scheduling of China earthquake grid experiment system: Construction of resource management and job dynamic scheduling model ProRMJS
    侯建民
    刘瑞丰
    单保华
    赵永
    牛爱军
    邹立晔
    侯立华
    韩军
    [J]. Earthquake Science, 2006, (06) : 695 - 703
  • [8] Resource management and scheduling model in grid computing based on an advanced genetic algorithm
    Tian, Hao
    Duan, Lijun
    [J]. DCABES 2007 PROCEEDINGS, VOLS I AND II, 2007, : 705 - 709
  • [9] Resource management and scheduling model in grid computing based on an advanced genetic algorithm
    Tian, Hao
    Duan, Lijun
    [J]. DCABES 2006 PROCEEDINGS, VOLS 1 AND 2, 2006, : 238 - 242
  • [10] Resource management and job scheduling of China earthquake grid experiment system: Construction of resource management and job dynamic scheduling model ProRMJS']JS
    Hou Jian-min
    Liu Rui-feng
    Shan Bao-hua
    Zhao Yong
    Niu Ai-jun
    Zou Li-ye
    Hou Li-hua
    Han Jun
    [J]. EARTHQUAKE SCIENCE, 2006, 19 (06) : 695 - 703