Deepwater Gas-Zone Shutoffs with wireline in openhole-gravel-pack completions

被引:0
|
作者
Zettner, Claudia [1 ]
Bensmiller, Hank [1 ]
Lane, Tom [1 ]
机构
[1] ExxonMobil, United States
来源
JPT, Journal of Petroleum Technology | 2015年 / 67卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:134 / 136
相关论文
共 5 条
  • [1] Openhole horizontal gravel pack from a deepwater TLP
    不详
    JOURNAL OF PETROLEUM TECHNOLOGY, 1999, 51 (04): : 62 - 64
  • [2] Openhole horizontal gravel pack from a deepwater TLP
    Duhon, Pete
    Holley, Alan
    Gardiner, Nick
    Grigsby, Tommy
    JPT, Journal of Petroleum Technology, 1999, 51 (04): : 62 - 64
  • [3] Single-stage cleanup and gravel pack simplify openhole completions
    Butler, B
    Adkins, M
    JOURNAL OF PETROLEUM TECHNOLOGY, 2002, 54 (01): : 24 - 24
  • [4] Development of the alba field-evolution of completion practices, Part 1: Openhole screen-only completions to gravel pack
    Murray, G
    Brookley, J
    Ali, S
    Davidson, E
    McMillan, N
    Roberts, J
    SPE DRILLING & COMPLETION, 2003, 18 (04) : 304 - 310
  • [5] A Deepwater Openhole Gravel-Pack Completion With Prolonged Well Suspension Without Initial Cleanup: An Angola Block 15/06 Case History
    Staltari, D.
    Urdaneta, J.
    De Azevedo, O.
    Pellicano, D.
    Ripa, G.
    Cauende, C.
    Nasrallah, M. M.
    Aye, Y. A.
    Djouli, L. B.
    Adeolu, A. I.
    Magloire, B. A.
    Kumar, A.
    Gadiyar, B. R.
    Parlar, M.
    SPE DRILLING & COMPLETION, 2017, 32 (02) : 79 - 85